Set-up / Retrofit
18
4. Remove the air cap.
5. Unscrew the swirl nozzle.
6. Screw on the new swirl nozzle by hand first.
Wait about 2 minutes until the new swirl nozzle has been thoroughly heated.
7. Tighten the new swirl nozzle
without using force
.
8. Replace the air cap.
9. Tighten the retainer ring
without using force
.
6.2
Assembling/dismantling the heatable hose
Wear safety gloves!
Danger of burns due to hot metal parts and due to discharged hot melt material.
To avoid burning yourself while assembling/dismantling the heated hose, always wear
heat protection gloves.
Danger of electric shocks!
Disconnect the power plug from the tank system before carrying out the following work.
Connecting and terminated electrical connections may only be implemented by compe-
tent electricians.
Required tool:
1 open-end wrench size 17
1 open-end wrench size 19
1 Phillips screwdriver
1 slotted screwdriver
Heating cylinder
Heating insulation
Spray air hose
Connection terminal
Spray air connection
Retaining nut for
spray air connection
Hose connection
Hose fitting
Heatable hose
Fig. 6/3: Hose connection in detail (using spray version as an example)
To dismantle the heatable hose, carry out the following work steps:
1. Heat up the heatable hose and the manual application unit to approx. 100 °C.
2. Turn off the pump of the tank system.
3. Activate the trigger on the manual application unit to release the system pressure.
4.
Disconnect the power plug from the tank system.
5.
Spray version only:
Summary of Contents for HB 5010
Page 10: ...2...
Page 14: ...Special security advice 6...
Page 16: ...Technical data 8 Figure 2 1 2 Location of type plate on the inside of the unit...
Page 28: ...Operation 20...
Page 40: ...Operation 32...
Page 57: ...Repairs 49...
Page 60: ......
Page 62: ...Table of Contents 4 Table of contents...
Page 64: ...Specific security advice 6...
Page 68: ...Technical Data 10...
Page 76: ...Maintenance 18...
Page 80: ......
Page 82: ...4 Inhaltsverzeichnis...
Page 84: ...Specific safety instructions 6...
Page 90: ...Construction and function 12...
Page 92: ...Technical data 14...
Page 104: ...What happens if 26...
Page 107: ...Accessories 29...
Page 110: ...Ersatzteillisten...
Page 115: ...Spare parts list 3 1 HB 5010 Tank System basic unit Fig 1 1 Spare parts for basic unit Part 1...
Page 128: ...Spare parts list 16 2 3 Spare parts bead and spray 19 9 Fig 2 11 Grip casing both versions...
Page 129: ...Spare parts list 17 11 Fig 2 12 Heat insulation half shell both versions...
Page 130: ...18 Spare parts list 10 Fig 2 13 Trigger and mounting parts both versions...
Page 133: ...Table of contents 21...
Page 136: ...Table of Contents 2...
Page 138: ...4...