Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
192
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Bayonet catch
2 Handle
3 Connection Reductor
4 Ball valve fastening
5 Ground-in clamp
6 O
2
supply tube
7 Post combustion tube connection
Phase 2: Refill the Regainer
Proceed as follows:
Open the front door.
Unscrew the combustion tube connector. To do so, turn the bayonet catch handle (2) slowly to
the right.
Remove the ground-in clamp (5) on the reductor (3).
Remove the O
2
supply tube (6) by opening the two ground-in clamps (5).
Remove the ground-in clamp (5) on the post combustion tube (7).
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Plug of Reductor
6 Reductor
Phase 2: Refill the Regainer
Proceed as follows:
Press the post combustion tube plug (1) and the combustion tube connection (3) down lightly and
pull the furnace out of the instrument to the front.
Pull the combustion tube connection (1) out of the combustion tube (2) with careful jiggling
motions.
Place the post combustion tube plug (1) on the tube rack.
Summary of Contents for DuMaster D-480
Page 1: ...DuMaster D 480 Operation Manual 11593626C en...
Page 4: ......
Page 12: ......
Page 16: ......
Page 30: ......
Page 102: ......
Page 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Page 338: ......
Page 352: ......
Page 353: ......