![BRP Evinrude E-TEC Manual Download Page 312](http://html1.mh-extra.com/html/brp/evinrude-e-tec/evinrude-e-tec_manual_2820522312.webp)
312
Trim and Tilt
Trim and Tilt Service
Removal
Remove the four large motor flange retaining
screws. Remove the motor and discard O-ring,
screws, and washers.
Remove drive coupler from either the motor or the
pump assembly.
Installation
IMPORTANT – 3-Cylinder models:
Use only
Evinrude/Johnson
Biodegradable TNT
Fluid to fill
the hydraulic system.
Install drive coupler in pump assembly.
Install a new motor O-ring.
Position the motor on the manifold and install four
new
screws and lock washers. Tighten the screws
35 to 50 in. lbs. (4 to 5.6 N·m).
2-Cylinder Models
002531
3-Cylinder Models
004282
002532
002533
2-Cylinder Models
002531
3-Cylinder Models
004282
Summary of Contents for Evinrude E-TEC
Page 232: ...Powerhead Powerhead Views 232 2 Cylinder Front 008160...
Page 233: ...Powerhead Powerhead Views 233 10 2 Cylinder Rear 010509...
Page 234: ...Powerhead Powerhead Views 234 2 Cylinder Top 010511...
Page 235: ...235 Powerhead Powerhead Views 10 2 Cylinder Top Rope Start Models 008186...
Page 238: ...Powerhead Powerhead Views 238 3 Cylinder Front 008166...
Page 239: ...239 Powerhead Powerhead Views 10 3 Cylinder Rear 010515...
Page 240: ...Powerhead Powerhead Views 240 3 Cylinder Top 010517...
Page 326: ...S 326...