![BRP Evinrude E-TEC Manual Download Page 227](http://html1.mh-extra.com/html/brp/evinrude-e-tec/evinrude-e-tec_manual_2820522227.webp)
227
Powerhead
Powerhead Installation
10
•
Tighten the upper mount screws to a torque of
110 to 130 ft. lbs. (149 to 176 N·m). Make sure
that screw heads are tight against steering arm.
IMPORTANT:
Retighten powerhead mounting
screws after outboard has been run at full operat-
ing temperature and allowed to cool.
Apply
Gasket Sealing Compound
to exhaust relief
muffler gasket and retaining screws. Install muffler
and tighten screws to a torque of 60 to 84 in. lbs.
(7 to 9.5 N·m).
Place the shift rod in the shift rod lever. Install the
retaining pin and washer. Tighten pin to a torque
of 60 to 84 in. lbs. (7 to 9.5 N·m).
Check shift linkage adjustment. Refer to
IMPORTANT:
Make sure the gearcase shifts
solidly into both forward and reverse and that pro-
peller shaft spins freely in neutral.
1.
Large powerhead screws
2.
Small powerhead screws
3.
Upper mount screws
002153
1.
Rear small powerhead screw
002160
Large screw torque sequence, 1–8
Small screw torque sequence, A–E
002167
3
2
1
1
1
002163
1.
Shift rod screw
002013
1
Summary of Contents for Evinrude E-TEC
Page 232: ...Powerhead Powerhead Views 232 2 Cylinder Front 008160...
Page 233: ...Powerhead Powerhead Views 233 10 2 Cylinder Rear 010509...
Page 234: ...Powerhead Powerhead Views 234 2 Cylinder Top 010511...
Page 235: ...235 Powerhead Powerhead Views 10 2 Cylinder Top Rope Start Models 008186...
Page 238: ...Powerhead Powerhead Views 238 3 Cylinder Front 008166...
Page 239: ...239 Powerhead Powerhead Views 10 3 Cylinder Rear 010515...
Page 240: ...Powerhead Powerhead Views 240 3 Cylinder Top 010517...
Page 326: ...S 326...