S-7300A
8. REPLACING PARTS
164
8-6-2.
Adjusting the tension stud bracket assembly position
1. Adjust so that the thread path hole (2) in the bobbin
winder tension assembly (1) is in the position relative to
the bobbin case (3) shown in the illustration.
1038D