3-24
Confidential
(6) Push the hook on the lift gear Z27M10 (or lift gear Z48M10) while lifting the plate-up
plate, and remove the lift gear Z27M10 (or lift gear Z48M10) from the paper tray 1.
250 sheets: Lift gear Z27M10
500 sheets: Lift gear Z48M10
(7) Remove the gear Z22M10 and the idle gear Z18M10 from the paper tray 1.
Fig. 3-16
Gear Z22M10
Idle gear Z18M10
Lift gear Z27M10 or
Lift gear Z48M10
Paper tray 1
Plate-up plate
Plate-up plate
Hook
Summary of Contents for MFC-8510DN
Page 27: ...Confidential CHAPTER 1 SPECIFICATIONS ...
Page 43: ...Confidential CHAPTER 2 TROUBLESHOOTING ...
Page 143: ...Confidential CHAPTER 3 DISASSEMBLY REASSEMBLY ...
Page 155: ...3 9 Confidential Hinge ASSY L Fig 3 7 Hinge R Legal model only Fig 3 8 ...
Page 277: ...Confidential CHAPTER 4 ADJUSTING AND UPDATING SETTINGS AS REQUIRED AFTER PARTS REPLACEMENT ...
Page 293: ...Confidential CHAPTER 5 SERVICE FUNCTIONS ...
Page 300: ...5 5 Confidential Fig 5 1 ...
Page 325: ...5 30 Confidential Fig 5 14 ...
Page 327: ...5 32 Confidential Fig 5 15 ...
Page 346: ...Confidential CHAPTER 6 WIRING DIAGRAM ...
Page 348: ...6 1 Confidential 1 WIRING DIAGRAM Wiring diagram ...
Page 349: ...Confidential CHAPTER 7 PERIODICAL MAINTENANCE ...
Page 368: ...Confidential APPENDIX 1 SERIAL NUMBERING SYSTEM ...
Page 372: ...Confidential APPENDIX 3 INSTALLING MAINTENANCE DRIVER ...