3-20
420 Outrage
Chapter 3 • Systems Overview & Operation
R
Your boat is equipped with a
waste disposal system located
in the head on the starboard aft
side of the cabin. The system
is protected by the “HEAD”
breaker on the DC Breaker
Panel on the port side of the
cabin. The vacuum pump switch must be ON for the
system to function.
The waste system includes an electric VacuFlush
toilet, vacuum generator, a holding tank and thru-
hull vent.
waterways, Freshwater lakes and Impoundments
accessible through locks and other flowing waters
that are navigable interstate by vessels subject to
this regulation. (40CFR 140.3)
NEUTRAL
TROL
L
SYNC
TRANSFE
R
1 LEVEL
THROTTLE
ONL
Y
DOCK
TRIM
UP
DN
NEUTRA
L
TROLL
SYNC
TRANSFE
R
1 LEVER
THROTTLE
ONL
Y
DOCK
12V DC
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
UNSWITCHED
MAIN
24HR
PORT AFT
WINDLASS
AMP 1
WINDLASS
CONTROL
SHOWER
SUMP
ACC
HELM
SEAT
BOW
TABLE
DECK 12V
OUTLETS
HEAD
CABIN
REFRIG
CABIN 12V
OUTLETS
DATA
NETWORK
DATA
NETWORK
BATT SW
CONTROL
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
MAIN
STBD AFT
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
BILGE
PUMPS
LIGHTING
CONSOLE
ELECTRONICS
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
WIPER/
WASHER
TRIM TABS
PREP
STATION
O
OFF
ON
1
O
OFF
ON
1
O
OFF
ON
1
HARDTOP
STEREO
SAT TV
AMP 2
AMP 3
AMP 4
24HR
24HR
When depressed, the “FLUSH” button on the
function panel opens a mechanical seal which allows
a vacuum to force waste through the opening in the
bowl to the vacuum generator and then to the holding
tank.
Operation
• If there is no water in the bowl, depress the
“ADD WATER” button on the function panel
(Fig. 3.21.2).
Electric VacuFlush Head
This boat is equipped with a direct overboard
discharge valve. Discharging of sewage
directly overboard is for use where approved
only. Damage to the system could occur if
the discharge seacock is not open during
operation.
NOTICE
Head System
Environmental Considerations
The Environmental Protection Agency (EPA)
standards state that in freshwater lakes, reservoirs,
impoundments whose inlets or outlets are such as
to prevent the ingress or egress by vessel traffic
subject to this regulation, or in rivers not capable
of navigation by interstate traffic subject to this
regulation, marine sanitation certified by the United
States Coast Guard (U.S.C.G.) installed on vessels
shall be designed and operated to prevent the
overboard discharge of sewage, treated or untreated
or any other waste derived from sewage.
The EPA standards further state that this shall
not be construed to prohibit the carriage of Coast
Guard certified flow through treatment devices
which have been secured so as to prevent such
discharges. They also state that the waters where
a Coast Guard certified marine sanitation device
permitting discharge is allowed include: Coastal
waters, Estuaries, The Great Lakes and Intercoastal
Severe state and federal penalties are levied
for discharging raw sewage and solid waste
in waters where it is not permitted.
Demonstrating that you have disabled the
macerator by locking the system and/or
removing the seacock handle may avoid a fine.
It is illegal for any vessel to dump plastic trash
anywhere in the ocean or navigable waters of
the United States.
NOTICE
Maintenance
Maintenance of the raw water system requires
periodic inspection of the raw water intake strainer
and all fittings and hoses for system integrity to
prevent leaks.
Clean away debris and/or tighten hose connections
as required. The system should be run at least every
other month to keep the pumps impellers in good
condition.
PUMPS” switch on the prep station switch panel.
The spray head is activated by twisting the unit.
NOTICE
The “WATER PUMPS” switch activates both
the freshwater and raw water pumps. If only
one system is required the other pumps can be
turned off via the iPad, Raymarine or Czone on
Vessel View.
ATTENTION
The seacock MUST be in the OPEN position
when washdown is in use. Running the pump
dry may damage the unit.
Summary of Contents for 420 OUTRAGE
Page 1: ......
Page 48: ...1 28 420 Outrage R Chapter 1 Safety THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...2 46 Chapter 2 General Information 420 Outrage R THIS PAGE INTENTIONALLY LEFT BLANK...
Page 146: ...3 52 420 Outrage Chapter 3 Systems Overview Operation R THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...4 22 420 Outrage Chapter 4 Electrical R...
Page 177: ...4 31 Chapter 4 Electrical 420 Outrage R C ZoneNetwork Figure 4 31 1...
Page 178: ...4 32 420 Outrage Chapter 4 Electrical R C Zone Network Cont d Figure 4 32 1...
Page 179: ...4 33 Chapter 4 Electrical 420 Outrage R C Zone Network Cont d Figure 4 33 1...
Page 180: ...4 34 420 Outrage Chapter 4 Electrical R C Zone Network Cont d Figure 4 34 1...
Page 182: ...4 36 420 Outrage Chapter 4 Electrical R Starter Battery Arrangement Std Steering Figure 4 36 1...
Page 185: ...4 39 Chapter 4 Electrical 420 Outrage R House Battery Arrangement Triple Engine Figure 4 39 1...
Page 186: ...4 40 420 Outrage Chapter 4 Electrical R House Battery Arrangement Quad Engine Figure 4 40 1...
Page 187: ...4 41 Chapter 4 Electrical 420 Outrage R Battery Switch Control Standard Steering Figure 4 41 1...
Page 188: ...4 42 420 Outrage Chapter 4 Electrical R Battery Switch Control Joystick Steering Figure 4 42 1...
Page 189: ...4 43 Chapter 4 Electrical 420 Outrage R Master Ignition Key Switch Quad Engines Figure 4 43 1...
Page 190: ...4 44 420 Outrage Chapter 4 Electrical R Wiper and Washer Figure 4 44 1...
Page 191: ...4 45 Chapter 4 Electrical 420 Outrage R Windscreen Vent and Cockpit Shade Figure 4 45 1...
Page 192: ...4 46 420 Outrage Chapter 4 Electrical R Navigation and Flood Lights Figure 4 46 1...
Page 193: ...4 47 Chapter 4 Electrical 420 Outrage R Horn Map HT Accent Lighting Figure 4 47 1...
Page 194: ...4 48 420 Outrage Chapter 4 Electrical R Cabin Overhead and Skylights Bow Table Figure 4 48 1...
Page 195: ...4 49 Chapter 4 Electrical 420 Outrage R Bilge Pumps Sump Pump Figure 4 49 1...
Page 196: ...4 50 420 Outrage Chapter 4 Electrical R Deck Courtesy Lights Figure 4 50 1...
Page 197: ...4 51 Chapter 4 Electrical 420 Outrage R Miscellaneous Lighting Figure 4 51 1...
Page 198: ...4 52 420 Outrage Chapter 4 Electrical R Bow Thruster Figure 4 52 1...
Page 199: ...4 53 Chapter 4 Electrical 420 Outrage R Trim Tabs Figure 4 53 1...
Page 200: ...4 54 420 Outrage Chapter 4 Electrical R Windlass Figure 4 54 1...
Page 201: ...4 55 Chapter 4 Electrical 420 Outrage R Waste System Figure 4 55 1...
Page 202: ...4 56 420 Outrage Chapter 4 Electrical R Pumps 1 Mech Space Lights Figure 4 56 1...
Page 203: ...4 57 Chapter 4 Electrical 420 Outrage R Livewell Pumps and Lights Figure 4 57 1...
Page 204: ...4 58 420 Outrage Chapter 4 Electrical R Starboard Pumps Underwater Lights Figure 4 58 1...
Page 205: ...4 59 Chapter 4 Electrical 420 Outrage R Blower Figure 4 59 1...
Page 206: ...4 60 420 Outrage Chapter 4 Electrical R TDS Stage 3 with Remote Monitoring Figure 4 60 1...
Page 208: ...4 62 420 Outrage Chapter 4 Electrical R AC Power 120V 60hz Figure 4 62 1...
Page 209: ...4 63 Chapter 4 Electrical 420 Outrage R Shore Power Inlets 230V 50hz Figure 4 63 1...
Page 210: ...4 64 420 Outrage Chapter 4 Electrical R Cabin and Deck Air Conditioning Figure 4 644 1...
Page 213: ...4 67 Chapter 4 Electrical 420 Outrage R Diesel Generator Automatic Shutdown Figure 4 67 1...
Page 214: ...4 68 420 Outrage Chapter 4 Electrical R Generator 120V 60hz Figure 4 68 1...
Page 215: ...4 69 Chapter 4 Electrical 420 Outrage R Generator 230V 50hz Figure 4 69 1...
Page 216: ...4 70 420 Outrage Chapter 4 Electrical R Diesel Generator 230V 60hz Figure 4 70 1...
Page 217: ...4 71 Chapter 4 Electrical 420 Outrage R Standard Audio with Fusion Figure 4 71 1...
Page 218: ...4 72 420 Outrage Chapter 4 Electrical R Premium Audio Fusion Figure 4 72 1...
Page 219: ...4 73 Chapter 4 Electrical 420 Outrage R Premium Audio with Fusion w Satellite Figure 4 73 1...
Page 220: ...4 74 420 Outrage Chapter 4 Electrical R Audio Zones Speaker Locations Figure 4 74 1...
Page 221: ...4 75 Chapter 4 Electrical 420 Outrage R Engine Flush System Figure 4 75 1...
Page 222: ...4 76 420 Outrage Chapter 4 Electrical R Electric Reels Downrigger Figure 4 76 1...
Page 223: ...4 77 Chapter 4 Electrical 420 Outrage R Tow Package Figure 4 77 1...
Page 224: ...4 78 420 Outrage Chapter 4 Electrical R Skylight Option Figure 4 78 1 6015 07 401_AI...
Page 226: ...4 80 420 Outrage Chapter 4 Electrical R 6015 07 401_AI Spotlights Figure 4 80 1...
Page 228: ...4 82 420 Outrage Chapter 4 Electrical R Battery Switch Control Triple Engine Figure 4 82 1...
Page 229: ...4 83 Chapter 4 Electrical 420 Outrage R Master Ignition Key Switch Triple Engine Figure 4 83 1...
Page 230: ...4 84 420 Outrage Chapter 4 Electrical R Joystick Piloting Helm Figure 4 844 1...
Page 231: ...4 85 Chapter 4 Electrical 420 Outrage R Joystick Piloting Dual Helm Figure 4 85 1...
Page 234: ...4 88 420 Outrage Chapter 4 Electrical R Chiller Harness Figure 4 88 1 6015 07 401_AI...
Page 235: ...4 89 Chapter 4 Electrical 420 Outrage R Bonding Harness Figure 4 89 1...
Page 236: ...4 90 420 Outrage Chapter 4 Electrical R Battery Harness Figure 4 90 1...
Page 237: ...4 91 Chapter 4 Electrical 420 Outrage R Receptacle Harness Figure 4 91 1...
Page 238: ...4 92 420 Outrage Chapter 4 Electrical R Deck Plate Grounding and C Zone harness Figure 4 92 1...
Page 239: ...4 93 Chapter 4 Electrical 420 Outrage R Generator and Windlass Harness Figure 4 93 1...
Page 240: ...4 94 420 Outrage Chapter 4 Electrical R Cabin Headliner Harness Figure 4 94 1...
Page 241: ...4 95 Chapter 4 Electrical 420 Outrage R Cabin Lower Harness Figure 4 95 1...
Page 242: ...4 96 420 Outrage Chapter 4 Electrical R 120V AC Harness Figure 4 96 1...
Page 243: ...4 97 Chapter 4 Electrical 420 Outrage R Helm and Bow Thruster Harness Figure 4 97 1...
Page 245: ...4 99 Chapter 4 Electrical 420 Outrage R Upper Station and Freezer Plate Harness Figure 4 99 1...
Page 246: ...4 100 420 Outrage Chapter 4 Electrical R Hardtop Harness Figure 4 100 1...