Commissioning Step by Step
4–27
1070 072 262-101 (01.09) GB
L
Switch controller to RUN.
Final step
.
The commissioning process is completed with loading of the PLC pro-
gram. The ZS550 have been configured, the PLC programs transmitted
and the controllers are in mode of operation RUN.