
Integrated Multi-parameter Sensor Operation manual
21
Figure 17 the diagram of operation process
3.4 Installation Environment
Avoid the following places during installation:
1.
The place where the sunlight directly shines and the vicinity of the heat appliance.
2.
The place where the ambient temperature exceeds 60 °C during work.
3.
The vicinity of the electromagnetic source.
4.
A place with strong mechanical vibration.
3.5 Installation Precautions
1.
During handling or installation, please note: If there is an ion electrode, the counterweight should be pl
aced face down, do not place it sideways (less than 60 degrees), do not invert. Or need to shake the probe
vertically downwards to ensure that the ion probe is working properly.
2.
After power-on, observe that the running light is normally blinking. Then after 5 minutes, you need to r
ead the working voltage through the platform to check whether the external power line connection is nor
mal. For example, 12V power supply, the operating voltage is read to 28V, then the internal battery is po
wered, and the external power supply is abnormal.