Installation
3.5
Commissioning
Page 36
BOGE Operating instructions for C 16 N...C 30 N, C 16 F N...C 30 F N series screw compressors
Conducting trial run
Close mains disconnecting device.
–
Switch on the compressor using the ON key. The compressor starts.
–
When the factory-set switch-off pressure is reached, the compressor cuts
off automatically.
–
Check network pressure on control display.
If necessary, reset operating pressure (pressure target value).
–
The compressor is ready for operation.
Switch off the compressor after a trial run of several hours under maximum
load.
List up the test results in the commissioning certificate.
Commissioning
following extended
stoppages
If an extended stoppage is scheduled, you should contact BOGE-Service
beforehand.
Following an extended stoppage of more than 2 months, fill a small amount
of oil in the suction controller prior to starting the compressor.
Fig. 3.7: Suction controller
WARNING!
Only fill the suction controller with the grade of oil used to operate the com-
pressor.
Never mix different oil grades and brands.
WARNING: Risk of injury!
Actuate emergency-stop switch/button, open mains disconnecting device
and secure by means of lock out tag out.
–
Unscrew the plug on the suction
controller (1).
–
Fill approx. 0.03 gallons com-
pressor oil into the suction con-
troller.
–
Reclose the controller using the
plug.
–
rior to switching on the compres-
sor wait for approx.10 min. until
the oil has spread evenly. Then
switch the compressor on and
immediately off again.
–
After approx.10 sec. the com-
pressor can be started.
1