Installation
3.1
Transport and storage
Page 24
BOGE Operating instructions for C 16 N...C 30 N, C 16 F N...C 30 F N series screw compressors
Crane transport
Fig. 3.2: Crane transport
Intermediate storage
In case the compressor is not installed immediately after delivery, it has to be
stored at a sheltered location. It must be ensured that during the intermediate
storage neither dust nor humidity can penetrate.
WARNING!
Do not subject the safety cladding to force during transport. Protect the com-
pressor using wooden spacers (see arrows in the following illustrations).
Remove the transport timbers.
Only use suitable transport slings. Position
the slings at the ends underneath the base
frame of the compressor.
NOTICE!
In case of an intermediate storage please observe the specifications and
directions as to permissible environmental impacts (see chapter „3.2 Com-
pressor room: Installation, maintenance conditions and application for com-
pressed air receivers: receiver mounted or seperately installed“).
In case of a careless storage we assume no liability for consequent dam-
ages!
In the event of an extended intermediate storage you should consult BOGE-
Service.
Please observe the directions for commissioning after an extended standstill
(see chapter „3.5 Commissioning“) if the intermediate storage takes longer
than two months.