STEP
15
Above shows STEP 15
assembled and completed
39
Selectoe Eod Top Bolt(52) must be threaded a
minumum of 1/2" into the Selector Rod (6),and Jam
Nut (54) tightened securely against spring lock
washer (53) to ensure proper connection.Check the
Jam Nut (54) once a week to make sure it is tight.
79
52
99
136
135
!
!
WARNING
6
135
54
53
6
1
/2
"
(at least)
36
F
130
A7
A6
A5
A3
AA
A1
A2
A8
A4
Start at high pully station by
inserting the Metal Ball End here.
6
36
79
52
G
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...