Pec Dec Cable (38)
A.
Attach metal ball end of Pec Dec Cable (38) to Right Pec Dec Cam (AQ) and route under
Top Main Frame (G).
B.
Attach the other ball end of Cable (38) to Left Pec Dec Cam (AL).
C.
Attach Pulley (C1) to flange on Top Main Frame (G) behind Right Pec Dec Cam (AQ) using:
One 76 (3/8”x 1 3/4” hex head bolt)
One 7 (pulley cable guide)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
Route Pec Dec Cable (38) over Pulley (C1).
D.
Attach Pulley (C2) to flange on Top Main Frame (G) behind Left Pec Dec Cam (AL) using:
One 76 (3/8”x 1 3/4” hex head bolt)
One 7 (pulley cable guide)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
Route Pec Dec Cable (38) over Pulley (C2).
E.
Hang Pec Dec Pulley Holder (131) on Pec Dec Cable (38) as shown and install
Pulley (C3) using:
One 76 (3/8”x 1 3/4” hex head Bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
17
Be careful to assemble all components
in the sequence they are presented.
S T E P
mm
Inch
NOTE:
All pulleys are the 4 1/4” diameter Pulleys (26), except where noted.
42
Metal Ball End
Metal Ball End
1890mm
6’ 2 1/2”
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...