STEP
21
51
Selector Eod Top Bolt(52) Must be threaded a
minumum of a 1/2" into the Selector Rod (6),
and Lock Nut (54) tightened securely to ensure
proper connection.
WARNING
!
!
NOTE 1
Before beginning final cable
adjustments,be sure that both of
these pulley housing nutt-up as
close as possible to the welded
stops on the frame pieces.
NOTE 2
Check lock nut
weekly to be
sure it is tight
and locked on
to the Selector
Eod.
(See page 61)
52
B.Rubber Stop(42)
Tighten
C
B
B
C
A
8
A
8
D
D
K
1
C
Selector Rod Top Bolt
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...