A.
Attach two Weight Stack Shims (28) to the bottom of Main Base Frame (A), and two Weight
Stack Shims (28) to the bottom of Side Base Frame (B). Also, install two Frame Levelers (25)
to the Main Base Frame (A) as shown.
B.
Attach Main Base Frame (A) to Side Base Frame (B) using:
Two 73 (3/8”x 2 3/4” hex head bolt)
Four 94 (3/8” washer)
Two 91 (3/8” nylon lock nut)
C.
Attach two Foot Caps (19) to the ends of Front Base Frame (C).
Attach Front Base Frame (C) to the Main Base Frame (A) using:
One 65 (1/2”x 3” hex head bolt)*
Two 93 (1/2” washer)
One 90 (1/2” nylon lock nut)
*NOTE:
Only use one bolt (65) as shown. You will need the other side open for step 5.
D.
Attach one Foot Cap (19) to one end of Rear Base Frame (D). Leave the other side open,
(depending on which side of the gym you want the low pulley station).* Connect Rear Base
Frame (D) and Rear Vertical Frame (E) to Main Base Frame (A) as shown using:
Two 64 (1/2”x 3 1/4” hex head bolt)
Four 93 (1/2” washer)
Two 90 (1/2” nylon lock nut)
*NOTE:
Depending on how much space you have available, and the configuration of your
room, you can assemble this gym with the low pulley station on either side.
E.
Attach End Cap (13) to the top of Rear vertical Frame (E) and Frame Leveler (25) to Rear
Base Frame (D).
1
Be careful to assemble all components
in the sequence they are presented.
S T E P
mm
Inch
NOTE:
Finger tighten all hardware in this step. Do Not wrench tighten until end of step 5.
10
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...