20
Be careful to assemble all components
in the sequence they are presented.
S T E P
mm
Inch
NOTE:
All pulleys are the 4 1/4” diameter Pulleys (26), except where noted.
Leg Press Cable (34)
A.
Attach the chain end of Leg Press Cable (34) to Leg Press Frame (BB) with Snap Link (43).
B.
Route Cable (34) into the top of pulley housing in Leg Press Pivot (BD) as shown and
install Pulley (F1) using:
One 75 (3/8”x 2” hex head bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
C.
Route Cable (34) over Pulley (F2) as shown.
D.
Route Cable (34) back into the bottom of pulley housing in Leg Press Pivot (BD) and install
Cable (34) over Pulley (F3) using:
One 75 (3/8”x 2” hex head bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
E.
Route Cable (34) through the opening in the support column of Leg Press Frame (BB).
Pull entire length of Cable (34) through.
Route Cable (34) around Pulley (F4) as shown and toward Pulley (F5).
F.
Route Cable (34) under Pulley (F5) and up to the bottom of Pulley Holder With Hook (133).
Attach Cable (34) to Pulley Holder With Hook (133).
Note:
You should now wrench tighten all bolts and nuts.
Except the pad bolts, Never re-tighten any pad bolts.
48
Chain End
Stamped Eye End
4300mm
14’1”
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...