4
Be careful to assemble all components
in the sequence they are presented.
S T E P
mm
Inch
NOTE:
Finger tighten all hardware in this step. Do Not wrench tighten until end of step 5.
A.
Attach Top Pulley Frame (K) to Top Main Frame (G) and Front Vertical Frame (F) as shown using:
One 61 (1/2”x 5 1/4” hex head bolt)
One 62 (1/2”x 5” hex head bolt)
Four 93 (1/2” washer)
Two 90 (1/2” nylon lock nut)
B.
Slide the four Shaft Collars (22) to the top of the four Guide Rods (J).
Insert the top of the Shaft Collars (22) into Top Pulley Frame (K).
Tighten the allen screw in each Shaft Collars (22).
C.
Insert two Pulleys (26) into Front Vertical Frame (F) as shown using:
Four 10 (pulley spacer)
Two 73 (3/8”x 2 3/4” hex head bolt)
Two 91 (3/8” nylon lock nut)
D.
Insert two Pulleys (26) into Top Pulley Frame (K) using:
Two 76 (3/8”x 1 3/4” hex head bolt)
Four 94 (3/8” washer)
Two 91 (3/8” nylon lock nut)
E.
Insert two Pulleys (26) into the pulley covers on the Top Main Frame (G) using:
Two 76 (3/8”x 1 3/4” hex head bolt)
Four 94 (3/8” washer)
Two 91 (3/8” nylon lock nut)
16
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...