![Blue Box KAPPA V SR Installation, Operating And Maintenance Manual Download Page 27](http://html1.mh-extra.com/html/blue-box/kappa-v-sr/kappa-v-sr_installation-operating-and-maintenance-manual_2775465027.webp)
Blue Box 21
4.3 WATER PIPING CONNECTIONS
Unit water pipework must be installed in accordance with national and local regulation and codes.
Follow the recommendations below when designing the water piping circuit (refer to the diagrams included in this
manual).
- Piping should be connected to the unit with flexible joints, to avoid vibration transmission and allow for thermal
expansion (the same procedure should be adopted for the circulating pumps).
- The following devices should be located on the piping system:
- Isolating/regulating valves, temperature gauges or thermometer pockets, pressure gauges or binder points
required for servicing operations.
- Serviceable mesh strainer, with a filtration level no larger than 1mm, located on the unit inlet to prevent debris
from entering the heat exchangers.
- Vent valves, to be installed in the upper parts of the circuit, for air bleeding.
- Expansion device with accessories for circuit pressurisation, water thermal expansion compensation and system
filling.
- Unload valve and if necessary drainage tank for circuit emptying during maintenance and seasonal stop.
Summary of Contents for KAPPA V SR
Page 2: ......
Page 6: ......
Page 29: ...Blue Box 23 HYDRAULIC CIRCUIT DIAGRAM VERSION KAPPA V SR ST 2PS...
Page 40: ...Blue Box 34 ELECTRICAL PANEL LAY OUT MODELS 65 2 100 2...
Page 69: ...Blue Box 63 KAPPA V SR REFRIGERANT CIRCUIT...
Page 70: ...Blue Box 64 KAPPA V SR HP REFRIGERANT CIRCUIT...
Page 71: ...Blue Box 65 KAPPA V SR DC REFRIGERANT CIRCUIT...
Page 80: ...Blue Box 74...
Page 81: ......