
Gene Q Thermal Cycler
Chapter 3 Preparations
—
8
—
4 Inspection before Power-on
Before switch the power on, please ensure that:
1)
Supply voltage falls within the specified limits (refer to Chapter 2);
2)
The plug has been inserted into the power socket reliably;
3)
The grounding of the power line is reliable.
5 Power-on Procedures
Turn on the power (i.e. turn the power switch to position ‘1’), the Thermal Cycler will beep twice, and
the LCD will display “self test …”. That means the device is under self-testing, which will last for
about 1-2 minutes. Please wait patiently. After the self-testing is passed, the main menu is
displayed, and the device is ready for operations such as editing, accessing, modifying, or deleting
a PCR amplification file.
Summary of Contents for GeneQ Thermal Cycler
Page 33: ...NOTES...