MK LIT (E5) 01/2021
page 69/172
•
Connect the high-pressure hose. Tightening torque of the union nut: 30 Nm +/- 5 Nm
Connected high-pressure hose
The union nut must be firmly tightened, otherwise leakage of CO
2
is possible.
DANGER
Danger of suffocation and poisoning by leakage of CO
2
in high concentration
(> 4 Vol.-%).
Death due to suffocation.
Make sure that the union nut is firmly tightened. Observe the prescribed tightening
torque.
11.2 Commissioning an operator-provided inertization
If operator-provided inertization is used, ensure that it is correctly configured and functional.
The operator is responsible for the effectiveness of the customer-provided inertization measures.
Configuration
•
Setting O
2
sensor alarm threshold 1
To release the higher-level control system, alarm threshold 1 of the O
2
sensor can be set to the desired
value (e.g. 4 Vol.% O
2
). To do this, contact BINDER Service.
•
If desired:
Set alarm threshold 2
To do this, contact BINDER Service.
•
Setting the inert gas flow rate
Set the flow rate for inert gas at the flow meter according to whether O
2
control or permanent inertization
with constant flow is to be used
To do this, the solenoid valve must be open. This should be done by means of an appropriate circuit.
(chap. 9.2)
Summary of Contents for 9020-0402
Page 159: ...MK LIT E5 01 2021 page 159 172 30 7 Dimensions LIT MK 240 dimensions mm...
Page 160: ...MK LIT E5 01 2021 page 160 172 LIT MK 720 dimensions mm...
Page 162: ...MK LIT E5 01 2021 page 162 172...
Page 163: ...MK LIT E5 01 2021 page 163 172...
Page 165: ...MK LIT E5 01 2021 page 165 172...
Page 166: ...MK LIT E5 01 2021 page 166 172 31 3 Safety concept certificate from T V S d...
Page 173: ......