15.1 Initial operation
15.1.1 Prerequisites
•
Check whether all works as described in chapters 8 to 14 have been carried out
correctly.
•
Once all casings and safety devices are mounted and operative, the main switch
can be turned to the ON position.
•
Carry out a visual inspection before starting the system.
•
Check and examine:
•
the system in its starting position
•
the faultless mechanical working of all moving parts
•
the sense of rotation of the driving motor and all other motors
•
the limit switch of the adjustment drive
•
the emergency-stop function
•
Test the different operating procedures.
15.1.2 Dosing
Adjust the flow of material immediately after turning on the level adjustment of the feed
hopper. Slowly pull up the adjustment knobs and observe the material flow through the
inspection glass.
You may only take the device into operation, when all components have
been completely integrated in the installation.
All protective systems have to be correctly installed.
Remove all items that might have fallen into the feed hopper before setting
the swing plate back to its original position via the adjustment knobs.
The space between the individual carrier plates must not be filled more
than 3/4 with material to be conveyed.
Summary of Contents for Dry Rapid DR 1500
Page 1: ...Mounting and operating instructions Dry Rapid DR 1500 Code No 99 97 4021 GB Edition 08 2010...
Page 2: ......
Page 4: ......
Page 83: ...Drive unit Page 73 DR 1500 Edition 08 10 M 4021 GB Figure 9 13 Drive with clamping device...
Page 162: ...Page 152 Control and operation DR 1500 Edition 08 10 M 4021 GB Description of sensor MS45R...