O&M Manual for PowerKit M26 Series Diesel Engine
37
4. Operation
The first engine commissioning process should be handled by
S. I. Moteurs Baudouin
ap-
proved personnel. The successful completion of this process, along with the checks and ad-
justments required by
S. I. Moteurs Baudouin
, will ensure that the engine runs efficiently,
reliably, and safely.
Failure to comply with the installation and
operating instructions as defined by
S. I.
Moteurs Baudouin
will void the warranty.
People will be required to wear Individual Protection Equipment (IPE) and use correct tools
following official standards.
Make sure that the engine is correctly protected regarding its environment conditions.
Take the necessary measures for the emergency shut-off of the fuel or air supply to prevent
from over-speed risks.
Check the cleanliness of circuits.
Check for free circulation of gases in exhaust ducts.
Check the fuel supply.
Check coolant level and fill if necessary.
Check oil level and fill if necessary.
Check air clogging indicator.
Pre-lubricate before engine start-up after an engine has been stopped longer than 24h,
for a shorter period, pre-lubrication is unnecessary.
Summary of Contents for 12M26 Series
Page 1: ...1 1003195965 ...
Page 2: ...2 Operation and Maintenance Manual for PowerKit M26 Series Diesel Engine GDMB26V1901 ...
Page 31: ...O M Manual for PowerKit M26 Series Diesel Engine 31 12M26MP Figure 3 2B 12M26 Mounting ...
Page 78: ...O M Manual for PowerKit M26 Series Diesel Engine 78 6 6 Engine Maintenance Log ...
Page 79: ...O M Manual for PowerKit M26 Series Diesel Engine 79 ...