3.3 Accessories
In order to ensure satisfactory engine life
and performance, the installation of pipes
must meet the following criteria:
The intercooler pipe and the engine are
connected by a V-clamp. When in-
stalling, ensure that the direction of the
pipe in the expansion joint is consistent
with the direction of the air flow. Add
O-ring seal during installation.
Two cooling brackets need be installed
between the intermediate cooling pipe
and the tank through the V-type clamp.
The coolant connecting pipe relates to
the engine through bolts, and O-rings
are installed between the connecting
flanges.
The coolant connecting pipe relates to
the clamp and the radiator through the
hose.
The engine coolant outlet tube is con-
nected to the engine via a clamp.
Figure 3.3-Pipes
Summary of Contents for 12M26 Series
Page 1: ...1 1003195965 ...
Page 2: ...2 Operation and Maintenance Manual for PowerKit M26 Series Diesel Engine GDMB26V1901 ...
Page 31: ...O M Manual for PowerKit M26 Series Diesel Engine 31 12M26MP Figure 3 2B 12M26 Mounting ...
Page 78: ...O M Manual for PowerKit M26 Series Diesel Engine 78 6 6 Engine Maintenance Log ...
Page 79: ...O M Manual for PowerKit M26 Series Diesel Engine 79 ...