Field Service Manual
December 2003
Page 15 of 276
S
ilver
W
riter MF Site Preparation Checklist
Customer
code:
Plotter type:
Customer contact 1:
……………………..
Function:
……………………………...
Customer contact 2:…
…………………..
Function:
………………………………
Customer contact 3:
……………………..
Function:
………………………………...
Customer contact 4:
……………………..
Function:
………………………………
Installation address:
……………………………………………………………………………………..
……………………………………………………………………………………..
…………………………………………………………………………………..
………………………………………………………………………………………..
Plotter size: width=1725mm, depth=2358mm, min depth=1500mm, height=1825mm, service
height=2480mm, weight=1500 kg
Crate size: width=2010mm, depth=2766mm, height=2079mm, 500 kg (2000 kg with plotter)
Has the customer received the pre-installation manual?
Yes No
Does the customer have a storing place for the crate?
Yes No If
no, plastic must be available to cover the crate
Forklift truck to unload plotter from truck (2000kg load, long blades) must be
available
Manual forklift (1500kg) must be available during installation
The entrance for the plotter and corresponding passageways or corridors
must be free from obstacles
Is the floor (including passageways) stable enough?
Yes
No
(install thick metal plates)
Does the floor of the plotter room need to be reinforced?
Yes No
Will a film processor be online connected to the plotter?
Yes No
The plotter room must be big enough
(+1.5m space at drawer side, +1m
space at front and right side, 2.5m height)
Vibrations must comply with specs, in case of doubt contact specialized
company
Vacuum pump box must be installed in a dry and clean area
(max temp 30°C)
outside the plotter room. 75dB , 2.7kW at 250mbar , 50
°C
Vacuum tube length to plotter
→
maximum 15m, outer
∅
= 72mm
minimum (supplied by Barco)
Vacuum pump box command cable connector
∅
= 35mm (supplied by
Barco)
Summary of Contents for SilverWriter 800
Page 6: ...Field Service Manual December 2003 Page 6 of 276 ...
Page 8: ...Field Service Manual December 2003 Page 8 of 276 ...
Page 18: ...Field Service Manual December 2003 Page 18 of 276 ...
Page 20: ...Field Service Manual December 2003 Page 20 of 276 ...
Page 24: ...Field Service Manual December 2003 Page 24 of 276 ...
Page 95: ...Field Service Manual December 2003 Page 95 of 276 Multi FilmFeeder solid state panel ...
Page 96: ...Field Service Manual December 2003 Page 96 of 276 ...
Page 122: ...Field Service Manual December 2003 Page 122 of 276 ...
Page 130: ...Field Service Manual December 2003 Page 130 of 276 ...
Page 134: ...Field Service Manual December 2003 Page 134 of 276 ...
Page 168: ......
Page 172: ...Field Service Manual December 2003 Page 172 of 276 ...
Page 174: ...Field Service Manual December 2003 Page 174 of 276 ...
Page 187: ...Field Service Manual December 2003 Page 187 of 276 ...
Page 216: ...Field Service Manual December 2003 Page 216 of 276 ...
Page 220: ...Field Service Manual December 2003 Page 220 of 276 Main directory structure ...
Page 225: ...Field Service Manual December 2003 Page 225 of 276 Adding a DPF file in the plotter queue ...
Page 227: ...Field Service Manual December 2003 Page 227 of 276 Stop logging ...
Page 234: ...Field Service Manual December 2003 Page 234 of 276 ...
Page 240: ...Field Service Manual December 2003 Page 240 of 276 ...
Page 242: ...Field Service Manual December 2003 Page 242 of 276 ...
Page 246: ...Field Service Manual December 2003 Page 246 of 276 ...
Page 248: ...Field Service Manual December 2003 Page 248 of 276 ...
Page 252: ...Field Service Manual December 2003 Page 252 of 276 ...
Page 268: ...Field Service Manual December 2003 Page 268 of 276 ...
Page 270: ...Field Service Manual December 2003 Page 270 of 276 ...
Page 274: ...Field Service Manual December 2003 Page 274 of 276 ...