3.
Put the front log guard under an
angle between the two front ribs of
the cast iron side panels.
4.
Move the front log guard until it is
horizontal and lower it as far as
possible.
10.6.6
Install the upper baffle
Only do this procdure after finish of the procedure in section
1.
Move the upper baffle under an angle
into the combustion chamber.
2.
Move the left side of the baffle as
high as possible to the far left side of
the combustion chamber.
3.
Move the right side of the baffle up
until it is horizontal.
4.
Lower the baffle into the baffle
holder.
Maintenance
50
Cuatro-7 75-60
Summary of Contents for Cuatro-7 75-60
Page 6: ...1 Declaration of performance Declaration of performance 6 Cuatro 7 75 60...
Page 56: ...11 2 Connections on Opti Air system Technical data 56 Cuatro 7 75 60...
Page 59: ...12 Dimensions 12 1 Cuatro 7 75 60 with built in frame Dimensions Cuatro 7 75 60 59...
Page 60: ...12 2 Cuatro 7 75 60 with built in frame and convection casing Dimensions 60 Cuatro 7 75 60...
Page 66: ...12 8 Cuatro 7 75 60 with classic frame Dimensions 66 Cuatro 7 75 60...
Page 67: ...12 9 Cuatro 7 75 60 with classic frame and convection casing Dimensions Cuatro 7 75 60 67...
Page 75: ...Warranty Terms Cuatro 7 75 60 75...
Page 76: ...Your Barbas dealer 001 28 06 2022 352574 271 001...