May 22, 2023
EZ-SCREEN SLS Safety Light Curtain Instruction Manual
41
Receiver
Emitter
Trip Test
Figure 19.
◦
◦
◦
◦
◦
During each pass, while the test piece is interrupting the defined area, at least one Zone indicator
must be red. The
red Zone indicator must change with the position of the test piece within the defined area.
Trip Output Operation: The Status indicator must turn red and remain red for as long as the test piece remains
in the defined area. If not, the installation has failed the trip test.
Latch Output Operation: The Status indicator must turn red and remain red. The amber Reset indicator must
remain on. If the Reset indicator begins to flash at any time while the test piece is interrupting the defined
area, the installation has failed the trip test.
If all Zone indicators turn green or fail to follow the position of the test piece while it is within the defined area, the in-
stallation has failed the trip test. Check for correct sensor orientation, reflective surfaces, and unguarded areas creat-
ed due to the use of blanking. Do not continue until the situation is corrected. When the test piece is removed from
the defined area, in trip output operation, the Status indicator must be green (or flash green of Reduced Resolution is
enabled.) In Latch Output Operation, the Status indicator remains red until a manual reset is performed (the amber
Reset indicator flashes).
WARNING:
Trip test failure
Using a system that has failed a trip test can result in serious bodily injury or death. If the
trip test has failed, the system might not stop dangerous machine motion when a person or
object enters the sensing field.
Do not attempt to use the system if the system does not respond properly to the trip test.
4.
If mirrors are used in the application: Test the defined area on each leg of the sensing path (for example, emitter to
mirror, between mirror and receiver.
Receiver
Emitter
Mirror
5.
Trip Test with Corner Mirror
Figure 20.
System passes all checks during the trip test, go on to
"Electrical Connections to the Guarded
© Banner Engineering Corp.
Summary of Contents for EZ-SCREEN SLS
Page 16: ...May 22 2023 EZ SCREEN SLS Safety Light Curtain Instruction Manual 16 Banner Engineering Corp...
Page 52: ...Blank page 52...
Page 68: ...Blank page 68...
Page 90: ...Blank page 90...
Page 102: ...Blank page 102...
Page 106: ...Blank page 106...
Page 114: ...LinkedIn Twitter Facebook 2023 All rights reserved www bannerengineering com...