Maintenance
48
Avaya
t
RS9 UPS (9–18 kVA, 9-Slot Models) Site Preparation, Installation and Operator’s Manual
S
164201543 Rev A
5.
Insert the replacement module by sliding it carefully into the
cabinet. Lower the front down slightly and lift the rear edge
over the safety stop on the center support rail. Keep the module
handle extended until the module is fully inserted.
6.
Raise the module handle to secure the module into the cabinet.
Be sure the handle latch snaps into place. Tighten the
thumbscrew on the handle.
7.
Reinstall the front cover panel.