MODULEX CONTROLLER OPERATION
44
Sensor terminal assignments
Connector 7 [VII]
Connector 1 [I]
Connector 5 [V]
Connector 8 [VIII] =>
PT 1000 sensor
Pin 1: eBUS (FA) or 0-10V output
Pin 2: (Ground BUS / 0-10V)
Pin 1: Buffer storage tank low sensor
Pin 2:
Buf. stor. tank middle sensor / FBR heat. circ. 1 (room sensor)
Pin 3:
Buf. stor. tank top, sensor / FBR heating circuit 1 (set value)
Pin 4: Flow sensor, heating circuit 2 (ground)
Pin 5: Flow sensor, heating circuit 2
Pin 6: Waste water sensor
Pin 7: Waste water and boiler sensor (ground)
Pin 8: Boiler sensor
Pin 9: Outdoor sensor
Pin 10: Outdoor sensor (ground)
Pin 1: Flow sensor heating circuit 1 / sensor multifunction 1Pin 2: Service water low sensor / sensor
multifunction 2Pin 1: Sensor HS2 / Solar 2 / Multifunction relay 3Pin 2: Sensor Solar 1 / Sensor
multifunction relay 4
Summary of Contents for Modulex E8
Page 1: ...Operation User Guide Modulex E8 Controller ...
Page 30: ...MODULEX CONTROLLER OPERATION 28 Figure 3 7 INSTALLATION Menu Flow Chart ...
Page 50: ......
Page 51: ...MODULEX CONTROLLER OPERATION A 1 APPENDIX A CONTROLLER MENU LISTINGS ...