MODULEX CONTROLLER OPERATION
43
Plug 4 [IV]
IMPORTANT
THE PRIMARY PUMP (COLLECTOR PUMP 2) MUST BE WIRED TO RELAY A10.
N: Neutral conductor, mains
L1: Power supply, unit
L1´: Power supply to relay * (As per note above)
D
1: heating circuit pump HC 1
D
2: heating circuit pump HC 2
F
: Storage tank charging pump
v
: Mixer open, heating circuit 2
v
: Mixer closed, heating circuit 2
H
: Burner stage 1
H
: Burner stage 1
H
: Burner stage 2/HS2
H
: Burner stage 2/HS2
v
: Mixer heating circuit 1 open / Multifunction relay 1
v
: Mixer heating circuit 1 close / Multifunction relay 2
Collector pump 2/Switching valve / Multifunction relay 3
Collector pump 1(rpm)/Multifunction relay 4
Summary of Contents for Modulex E8
Page 1: ...Operation User Guide Modulex E8 Controller ...
Page 30: ...MODULEX CONTROLLER OPERATION 28 Figure 3 7 INSTALLATION Menu Flow Chart ...
Page 50: ......
Page 51: ...MODULEX CONTROLLER OPERATION A 1 APPENDIX A CONTROLLER MENU LISTINGS ...