MODULEX CONTROLLER OPERATION
A-12
EXPERT MENU TABLE -
Continued
FUNCTION
DESCRIPTION
ENTRY
RANGE
DEFAULT
INSTALLATION Sub-Menu
- Continued
SEQU CHANGE
Sequence change mode
01 - 06
06
SEQ SW TIME
Time to sequence change (seconds)
10 - 800
200
LOCK TIME
Min. delay time after switching ON or with
switching HS
00 min - 30 min
00
HYST BURNER2
Solid fuel integration: hysteresiys for the
charging pump
2K - 20K
2.0
HS COOL-FCT
T-HS COOL
HEATSOURCE 1
Identification of Boiler Type being used:
00 = No Boiler
01 = Single-Stage, switching
02 = Single-Stage, modulating
03 = 2-Stage, switching
04 = 2 individual, switching
05 = Multi-Stage, switching
06 = Multi-Stage, modulating (cascade via
BUS)
06
(Multi-Stage
Modulating)
HS 1 BUS
Connections for HS 1
00 - 04
02
HEATSOURCE 2
Secondary heat generator type
00 - 05
00
STORAGE HS2
Not Applicable
00 - 03
00
BUFFER
Not Applicable
00, 01, 02
00
SCREED
Not Applicable
N/A
N/A
SCREED PROGR
Not Applicable
N/A
N/A
RETURN
Press Program Key to exit INSTALLATION
Sub-Menu.
HOT WATER Sub-Menu
DHW RELIEF
Charge pump blocking.
00 = OFF
01 = ON
01 (ON)
PARALLEL
Parallel pump operation.
00 = Hot Water Priority
01 = Hot Water Partial Priority
02 = Pump Parallel Running
00, 01, 02
01
T-BOILER DHW
Boiler temperature increase during Hot Water
operation.
Boiler Temp = (DHW Temp Setting) + (T-
BOILER DHW)
0°C
– 90°C
36°C
HYST DHW
Hot Water Hysteresis
5°C
– 30°C
5°C
DHW FOLLOWUP
Pump Run-Down Time
00 min.
– 30 min.
00 min.
THERM INPUT
Storage Tank With Thermostat
00 = OFF
01 = ON
00 (OFF)
WALL HUNG
For Modulating Heat Source (HS)
00 = OFF
01 = ON
00 (OFF)
LOAD THROUGH
00 = OFF
01 = ON
00 (OFF)
Summary of Contents for Modulex E8
Page 1: ...Operation User Guide Modulex E8 Controller ...
Page 30: ...MODULEX CONTROLLER OPERATION 28 Figure 3 7 INSTALLATION Menu Flow Chart ...
Page 50: ......
Page 51: ...MODULEX CONTROLLER OPERATION A 1 APPENDIX A CONTROLLER MENU LISTINGS ...