![AUTOFLAME Mini Mk8 M.M. Installation And Commissioning Manual Download Page 4](http://html1.mh-extra.com/html/autoflame/mini-mk8-m-m/mini-mk8-m-m_installation-and-commissioning-manual_3021294004.webp)
4
Contents
目录
1 DIMENSIONS AND WIRING
尺寸和接线
............................................................................. 6
1.1 Mini Mk8 M.M
Mk8微型控制模块
. ...................................................................................... 6
1.1.1 Fixing Holes and Dimensions
固定孔和尺寸
.................................................................... 7
1.2 Wiring Schematic
配线线路图
............................................................................................. 8
1.3 Electrical Specifications
电气规格
........................................................................................9
1.3.1 Classifications
等级
........................................................................................................... 9
1.3.2 Inputs and Outputs
输入和输出
....................................................................................... 9
1.3.3 Cable Specifications
电缆规范
..........................................................................................11
1.3.4 Terminals Description
接线端子描述
.............................................................................. 12
1.4 Connection Between Mini Mk8 M.M. and Mk8 E.G.A
Mk8
微型控制模块与
Mk8 E.G.A.
的连接
. ............................................................................15
1.5 Connection Between Mini Mk8 M.M. and Mk7 D.T.I
Mk8
微型控制模块与
Mk7 D.T.I.
的连接
…………………………………........................................... 16
1.6 Sequencing Connection Diagram
多台
Mk8
微型控制模块排序连接图
................................................................................... 17
2 OPTIONS AND PARAMETERS
选项和参数
........................................................................ 18
2.1 Options
选项
……… ................................................................................................................ 18
2.2 Parameters
参数
……............................................................................................................ 40
3 COMMISSIONING PROCEDURE
调试流程
......................................................................... 48
3.1 Introduction to Commissioning
调试简介
........................................................................... 48
3.1.1 Commissioning Procedure
调试流程
................................................................................ 49
3.2 Installation Checks
安装检查
............................................................................................. 49
3.2.1 Commissioning Checks
调试检查
...................................................................................... 49
3.2.2 Operational Checks
运行检查
......................................................................................... 49
3.2.3 Installation Precautions
安装注意事项
............................................................................. 50
3.2.4 Maintenance and Servicing
维护和保养
........................................................................... 50
3.3 Servomotors
伺服马达
......................................................................................................... 50
3.3.1 Adjusting the Servomotor Potentiometer
调节伺服马达电位计
..................................... 51
3.3.2 Servomotor Feedback Voltage
伺服马达反馈电压。
....................................................... 52
3.3.3 Servomotors – Direction Change
伺服马达
–
改变马达转动方向
................................... 53
3.3.4 Servomotors with Autoflame Valves
带有
Autoflame
阀门的伺服马达
............................... 54
3.4 Commissioning Fuel and Air Positions
调试燃油和空气位置
.................................................55
3.4.1 Starting Commissioning
开始调试
….................................................................................. 56
3.4.2 Enter CLOSE Position
输入关闭位置
................................................................................. 57
3.4.3 Enter OPEN Position
输入开启位置
.................................................................................. 58
3.4.4 Enter START Position
输入启动位置
............................................................................... 59
3.4.5 Phase Hold
阶段保持
......................................................................................................... 60
3.4.6 Add Trim Data During Commissioning
在调试阶段添加
EGA
调节数据
.............................. 62
3.4.7 Commissioning VSD
调试变速驱动
................................................................................... 64
3.4.8 Set GOLDEN START Position
设置黄金启动位
.................................................................. 65
3.4.9 Set FGR START Position
设置烟气再循环启动位
................................................................ 66
3.4.10 Set HIGH Position
设置高火位置
..................................................................................... 68
3.4.11 Set INTER Position
设置中间位置
.................................................................................... 69
Summary of Contents for Mini Mk8 M.M.
Page 1: ...1...
Page 6: ...6 1 1 Mini Mk8 M M MK8 1 1 1 Fixing Holes and Dimensions...
Page 7: ...7 1 2 Wiring Schematic...
Page 8: ...8...
Page 15: ...15 1 4 Connection Between Mini Mk8 M M and Mk8 E G A Mk8 Mk8 E G A...
Page 16: ...16 1 5 Connection Between Mini Mk8 M M and Mk7 D T I Mk8 Mk7 D T I...
Page 17: ...17 1 6 Sequencing Connection Diagram Mk8...
Page 53: ...53 3 3 3 Servomotors Direction Change...
Page 122: ...122 Notes...
Page 123: ...123...
Page 124: ...124...