
13
You may not start to operate the machine until you
have read these operating instructions, observed all
the instructions given and installed the machine as
described!
Keep the instructions in a safe place for future use.
C
C
o
o
n
n
t
t
e
e
n
n
t
t
s
s
Extent of delivery
13
EC Declaration of Conformity
13
Symbols original instructions
14
Symbols on the machine
14
Operating times
14
Proper use
14
Residual risks
15
Vibrations (hand arm vibrations)
15
Safety advices
15
−
Personal protective equiment
16
−
Safety instructions – before working
16
−
Safety instructions – operating
16
−
Safety instructions – while working
16
−
General safety instructions
16
−
Safety instructions for the earth auger
17
−
Behaviour in an emergency situation
17
−
Safe handling with fuels
17
Description of device / spare parts
18
Assembly 18
Preparing for startup
18
−
Fuelling
18
−
Mixing
18
−
Fuelling of the device
19
Start-up 19
−
Starting with cold engine
19
−
Stopping the engine
19
−
Starting with warm engine
19
Working with the earth auger
20
Maintenance and cleaning
20
−
Cleaning the air filter
20
−
Cleaning/replacing the fuel filter
20
−
Checking/replacing the spark plug
20
−
Silencer
20
−
Checking the ignition spark
21
−
Adjusting the carburetor (idle speed)
21
−
Cleaning
21
Transport 21
Storage 21
Guarantee 21
Technical specifications
22
Maintenance and cleaning schedule
23
Possible faults
24
E
E
x
x
t
t
e
e
n
n
t
t
o
o
f
f
d
d
e
e
l
l
i
i
v
v
e
e
r
r
y
y
After unpacking, check the contents of the box for
!
completeness
!
possible transport damage.
Report any damage or missing items to your dealer, supplier or
the manufacturer immediately. Complaints made at a later date
will not be acknowledged.
•
1 Drive unit
•
3 Drills (Ø 100, 150, 200 mm)
•
1 Fuel mixing can
•
1 Tool bag containing
-
1 Allen key, size 4
-
1 Allen key, size 5
-
1 Allen key, size 6
-
1 Open-end wrench (size 8 and 10)
-
1 Open-end wrench (size 13 and 15)
-
1 Philips screw driver
-
1 Spark plug socket spanner
•
Original instruction
•
Assembly and operating instruction sheet
•
Warranty declaration
E
E
C
C
D
D
e
e
c
c
l
l
a
a
r
r
a
a
t
t
i
i
o
o
n
n
o
o
f
f
C
C
o
o
n
n
f
f
o
o
r
r
m
m
i
i
t
t
y
y
according to EC directive:
2006/42/EC.
We,
ATIKA GmbH
Josef-Drexler-Str. 8, 89331 Burgau – Germany
herewith declare under our sole responsibility that the products
Erdlochbohrer (Gasoline engine earth auger)
ELB 52
Serialnumber:
000001 – 020000
are conform with the above mentioned EC directives as well as
with the provisions of the guidelines below:
2004/108/EC.
Following harmonized standards have been applied:
EN ISO 12100:2010
Keeping of technical documents at:
ATIKA GmbH – Technical bureau
Josef-Drexler-Str. 8, 89331 Burgau – Germany
i.A.
Burgau, 25.09.2014
i.A.
G. Koppenstein
Engineering design management
Summary of Contents for ELB 52
Page 181: ...180 ...