System Calibration and Verification
7
7. A calibration report is automatically printed upon successful
completion of the calibration. Review the report, ensure it indicates
“H
2
O
2
Monitor: Passed” and tape the report to the Product
Verification Form.
8. Power the system off for 30 seconds. Power on to reset the H
2
O
2
detector reference voltage.
Diagnostics
1. Log in with SERVICE access and run the step-by-step diagnostics
(select OTHER diagnostic functions; do not select TEMPERATURE
diagnostics).
Temperature Verification
1. Run an empty chamber Standard Cycle until it is completed.
2. Log in as “Service.” Navigate to the Service/Temperature display.
3. Using an electronic thermometer, measure the temperature at the
chamber 1, door, vaporizer, and condenser thermistors. Record the
system display and electronic thermometer readings on the Product
Verification Form.
STERRAD
®
NX
™
Service Guide
123
Summary of Contents for sterrad NX
Page 1: ...STERRAD NX Sterilization System Service Troubleshooting Guide...
Page 10: ......
Page 16: ......
Page 21: ...Functional Description 3 Figure 1 Software Control Diagram STERRAD NX Service Guide 21...
Page 38: ......
Page 100: ......
Page 124: ......