Load Preparation
3
STERRAD
®
100NX
®
User’s Guide
27
Packaging and Loading
If you choose to package the instruments (highly recommended), proper use
and preparation of trays, pouches, and instruments can minimize or prevent
cycle cancellations and positive biological indicator (BI) results due to load-
related problems. All instruments must be cleaned, rinsed, and
thoroughly
dried
before loading into the sterilizer.
Special considerations for loading and processing flexible endoscopes are
presented at the end of this chapter.
Instrument Trays
Only STERRAD
®
Instrument Accessories and APTIMAX
®
Instrument
Trays, are recommended for use in the STERRAD
®
100NX
®
Sterilizer.
These instrument trays are specially designed to allow diffusion of
hydrogen peroxide and plasma around every item in the load.
Tray Mats
Instrument trays should only be padded with STERRAD
®
Instrument
Mats or polypropylene sterilization wrap.
Never use
linen, cellulose, or
any materials listed in the “Items Not To Be Processed” section.
Follow the
Instructions for Use
included with the STERRAD
®
Instrument Mats to determine the number of mats that can be used at one
time in the chamber. Do not use more than the recommended amount of
mat material in the chamber at any time.
Cycle Name Square
Centimeters
Square Inches
STANDARD
2250
349
DUO
2774
430
FLEX
2250
349
EXPRESS
1387
215
Do not use foam pads in instrument trays as they may absorb the
hydrogen peroxide.
Packaging
Use only STERRAD
®
Sterilizer-compatible polypropylene sterilization
wrap and Tyvek
®
pouches.Tyvek
®
Pouches and Rolls with STERRAD
®
Chemical Indicators are the only pouches and rolls available on the
market that are validated by ASP. They are the only pouches and rolls
validated by ASP for efficacy and stability.
DRAFT
Summary of Contents for Sterrad 100NX
Page 1: ...STERRAD 100NX Sterilization System User s Guide Ref 99994 M 99994_03 May 2014 D R A F T...
Page 21: ...Load Preparation 3 STERRAD 100NX User s Guide 19 D R A F T...
Page 22: ...3Load Preparation 20 STERRAD 100NX User s Guide D R A F T...
Page 23: ...Load Preparation 3 STERRAD 100NX User s Guide 21 D R A F T...
Page 49: ...Operation 4 STERRAD 100NX User s Guide 47 Cycle Completion Flowchart D R A F T...
Page 76: ...7Maintenance 74 STERRAD 100NX User s Guide D R A F T...
Page 80: ...8Reports and Files 78 STERRAD 100NX User s Guide D R A F T...
Page 104: ...9Access Levels and Supervisor Tasks 102 STERRAD 100NX User s Guide D R A F T...
Page 108: ...A Specifications 106 STERRAD 100NX User s Guide D R A F T...