TD 92579EN
15 February 2012 / Ver. H
Installation and Operation Manual
IP-DECT Base Station & IP-DECT Gateway (software version 5.0.x)
112
Figure 30. The sync trees for region 0, 1 and 2 where region 0 is fully expanded.
Region Details
1
Select DECT Sync > Air Sync Overview.
2
Click on the region ID text at top above the sync tree.
3
If this has not already been done: In the Region Details window, enter a name for
the region.
4
In section Statistics, there are three counters:
- Calculations: Is incremented each time the sync tree is calculated.
- Configurations: Is incremented when an IPBS has received a new sync instruction.
- Sync Lost
: Is incremented when an IPBS stops to handle radio traffic for a while
and after that restarts the synchronization procedure.
To clear the counters, click "Clear".
Reference Synchronization
To get the Sync Master to resynchronize to the reference sync, do as follows:
1
Select DECT Sync > Air Sync Overview.
2
Click on the region ID text at top above the sync tree.
3
In the Region Details window, click "Start". When resynchronizing, all ongoing calls
in the region will be disconnected.