TRACKPOINT 3
OPERATION
3-18
3.3.3
SETUP MENU
Setup Beacon List
The Beacon List window displays all beacons at once, in a grid layout, showing their parameters of
primary interest. (Clicking on the Beacon’s icon within the Project Tree is a quick key to displaying
the Beacon List.
) Having a single window that allows the user to see the
operating frequencies and parameters of all the available beacons makes it possible to compare
parameters and change any that may conflict. Double-clicking on an entry in the list (or using the
arrows keys to move to the desired entry and hitting 'Enter') displays up the Beacon Setup dialog
for that entry. If the entry in the list was 'empty', the Setup dialog comes up in 'Adding a New Bea-
con' mode. Entries may be moved to a new position in the list (thereby obtaining a new beacon
number) by cut-and-paste (Ctrl-X / Ctrl-V) keyboard operations. Cut-and-paste operation only
available within beacons 1-4 or within beacons 5-7. (Cannot copy simultaneous to consecutive
tracked beacons or vice versa.) Refer to Section 3.4 for Beacon List examples.
The 4450A can have up to 4 programmed beacons. All four can be active at any one time.
Summary of Contents for TRACKPOINT 3 4211A
Page 3: ......
Page 5: ......
Page 13: ...PRECAUTIONS viii ...
Page 14: ...SECTION ONE GENERAL INFORMATION ...
Page 15: ......
Page 18: ...TRACKPOINT 3 GENERAL INFORMATION 1 3 TRACKPOINT 3 CONSOLE FRONT VIEW FIGURE 1 1 ...
Page 20: ...TRACKPOINT 3 GENERAL INFORMATION 1 5 TRACKPOINT 3 SYSTEM COMPONENTS FIGURE 1 3 ...
Page 21: ...TRACKPOINT 3 GENERAL INFORMATION 1 6 FIGURE 1 4 ...
Page 27: ...TRACKPOINT 3 GENERAL INFORMATION 1 12 ...
Page 28: ...SECTION TWO INSTALLATION ...
Page 29: ......
Page 34: ...TRACKPOINT 3 INSTALLATION 2 5 FIGURE 2 2 ...
Page 35: ...TRACKPOINT 3 INSTALLATION 2 6 FIGURE 2 3 ...
Page 38: ...TRACKPOINT 3 INSTALLATION 2 9 MODEL 4740A INSTALLATION FIGURE 2 5 ...
Page 39: ...TRACKPOINT 3 INSTALLATION 2 10 FIGURE 2 6 C A U T I O N ...
Page 52: ...TRACKPOINT 3 INSTALLATION 2 23 FIGURE 2 15 ...
Page 53: ...TRACKPOINT 3 INSTALLATION 2 24 FIGURE 2 16 ...
Page 56: ...TRACKPOINT 3 INSTALLATION 2 27 FIGURE 2 17 ...
Page 62: ...SECTION THREE OPERATION ...
Page 63: ......
Page 132: ...TRACKPOINT 3 OPERATION 3 69 ...
Page 177: ...SECTION FOUR PRINCIPLES OF OPERATION ...
Page 178: ......
Page 183: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 5 ...
Page 185: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 7 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3A ...
Page 186: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 8 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3B ...
Page 189: ...SECTION FIVE MAINTENANCE ...
Page 190: ......
Page 193: ...TRACKPOINT 3 MAINTENANCE 5 1 DSP CARD PROGRAMMING MODE JUMPER FIGURE 5 1 ...
Page 201: ...APPENDIX A CARE OF CABLES ...
Page 202: ......
Page 204: ...TRACKPOINT 3 APPENDIX A A 2 ...
Page 205: ...APPENDIX B STATIC DISCHARGE ...
Page 206: ......
Page 208: ...TRACKPOINT 3 APPENDIX B B 2 ...
Page 209: ...APPENDIX C WARRANTY ...
Page 210: ......
Page 212: ...TRACKPOINT 3 APPENDIX C C 2 ...
Page 213: ...APPENDIX D DRAWINGS ...
Page 214: ......
Page 216: ...TRACKPOINT 3 APPENDIX D D 2 ...
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 235: ......
Page 236: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 244: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......