TRACKPOINT 3
OPERATION
3-68
Trackpoint 3-S Beacon List setup when tracking 2 Pingers (not common)
Scenario: 2 seabed locating Pingers asynchronously tracked
•
2 Pingers (Channel 1 & Channel 4) (Could have up to four pingers enabled at one time.) All frequencies must be different.
•
Only one Beacon can be enabled on any of the channels when in Pinger mode (Can be any one of the Beacons 1-4)
•
Beacons 1 & 7 LED’s (Receive) show status
•
Trigger-In 1 & 4 not applicable. Trigger-Out 1 & 7 not applicable.
Num
Target
Name
Type
Serial#
Chan#
Status
Xmit
Interval
Xmt
Freq
Recv
Freq
Pulse
Width
Manual
Depth
Filter
Level
Trigger
CONSECUTIVELY TRACKED TARGETS (TARGET LED #1)
1
1
2
1
3
1
4 Beacon4
Pinger
1 Active N/A N/A 25 N/A 25
4
N/A
SIMULTANEOUSLY TRACKED TARGETS (TARGET LED’s #2, #3, #4)
5
2
6
3
7 Beacon7
Pinger
4 Active N/A N/A 27 N/A 35
4
N/A
Summary of Contents for TRACKPOINT 3 4211A
Page 3: ......
Page 5: ......
Page 13: ...PRECAUTIONS viii ...
Page 14: ...SECTION ONE GENERAL INFORMATION ...
Page 15: ......
Page 18: ...TRACKPOINT 3 GENERAL INFORMATION 1 3 TRACKPOINT 3 CONSOLE FRONT VIEW FIGURE 1 1 ...
Page 20: ...TRACKPOINT 3 GENERAL INFORMATION 1 5 TRACKPOINT 3 SYSTEM COMPONENTS FIGURE 1 3 ...
Page 21: ...TRACKPOINT 3 GENERAL INFORMATION 1 6 FIGURE 1 4 ...
Page 27: ...TRACKPOINT 3 GENERAL INFORMATION 1 12 ...
Page 28: ...SECTION TWO INSTALLATION ...
Page 29: ......
Page 34: ...TRACKPOINT 3 INSTALLATION 2 5 FIGURE 2 2 ...
Page 35: ...TRACKPOINT 3 INSTALLATION 2 6 FIGURE 2 3 ...
Page 38: ...TRACKPOINT 3 INSTALLATION 2 9 MODEL 4740A INSTALLATION FIGURE 2 5 ...
Page 39: ...TRACKPOINT 3 INSTALLATION 2 10 FIGURE 2 6 C A U T I O N ...
Page 52: ...TRACKPOINT 3 INSTALLATION 2 23 FIGURE 2 15 ...
Page 53: ...TRACKPOINT 3 INSTALLATION 2 24 FIGURE 2 16 ...
Page 56: ...TRACKPOINT 3 INSTALLATION 2 27 FIGURE 2 17 ...
Page 62: ...SECTION THREE OPERATION ...
Page 63: ......
Page 132: ...TRACKPOINT 3 OPERATION 3 69 ...
Page 177: ...SECTION FOUR PRINCIPLES OF OPERATION ...
Page 178: ......
Page 183: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 5 ...
Page 185: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 7 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3A ...
Page 186: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 8 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3B ...
Page 189: ...SECTION FIVE MAINTENANCE ...
Page 190: ......
Page 193: ...TRACKPOINT 3 MAINTENANCE 5 1 DSP CARD PROGRAMMING MODE JUMPER FIGURE 5 1 ...
Page 201: ...APPENDIX A CARE OF CABLES ...
Page 202: ......
Page 204: ...TRACKPOINT 3 APPENDIX A A 2 ...
Page 205: ...APPENDIX B STATIC DISCHARGE ...
Page 206: ......
Page 208: ...TRACKPOINT 3 APPENDIX B B 2 ...
Page 209: ...APPENDIX C WARRANTY ...
Page 210: ......
Page 212: ...TRACKPOINT 3 APPENDIX C C 2 ...
Page 213: ...APPENDIX D DRAWINGS ...
Page 214: ......
Page 216: ...TRACKPOINT 3 APPENDIX D D 2 ...
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 235: ......
Page 236: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 244: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......