INSTALLATION
2-2
2.1.1
4610B SUGGESTED HYDROPHONE MOUNTING ASSEMBLY
The main function of the mounting assembly is to support the hydrophone vertically in the water.
Mount it at reasonable distance from the vessel's hull and below the level of the keel. The mount-
ing should be rugged enough to withstand the expected forces during the planned operation, and
easy to raise and lower. The type and size of the mounting recommended for the TrackPoint 3
hydrophone varies with the size of the surface vessel and the intended application.
The Model 4610B Hydrophone is supplied with a universal mounting bracket. The mounting
bracket attaches to the end of a suitable length of pipe. Choose the size and material of the pipe
according to the application. With the system in operation and underway at several knots, a five or
six-inch schedule 80 steel pipe with angle-iron fairings is recommended. On small vessels, the
TrackPoint 3 has been used with the hydrophone mounted to a two-inch aluminum pipe. Figure 2-1
illustrates a suggested mounting arrangement typical for slow-speed operation. Refer to drawing
100909 for mounting flange dimensions.
In the suggested mounting illustrated in Figure 2-1, a length of pipe with an inner diameter slightly
greater than 3 inches is permanently attached to the deck. A length of pipe with a 3-inch outer di-
ameter, permanently attached to the mounting pole, is fitted into the larger pipe and secured with
a locking pin. This secures the mounting pipe to the vessel for use, but allows the pipe to be re-
moved if necessary.
A support plate near water level helps secure the pipe in a vertical position. The angle iron on the
underwater portion of the pipe adds stiffness and reduces vibration.
The mounting bracket and hydrophone are attached to the lower end of the pipe with eye bolts.
The pipe has forward and aft guys leading from the point of attachment and secured on deck to
prevent bending or swaying.
In general, consider the following when designing the hydrophone mounting.
1.
The mounting pipe should be long enough to position the hydrophone below the vessel keel
when in the vertical position.
2.
The pipe used should be stiff enough to prevent vibration or strumming when the vessel is
underway.
Summary of Contents for TRACKPOINT 3 4211A
Page 3: ......
Page 5: ......
Page 13: ...PRECAUTIONS viii ...
Page 14: ...SECTION ONE GENERAL INFORMATION ...
Page 15: ......
Page 18: ...TRACKPOINT 3 GENERAL INFORMATION 1 3 TRACKPOINT 3 CONSOLE FRONT VIEW FIGURE 1 1 ...
Page 20: ...TRACKPOINT 3 GENERAL INFORMATION 1 5 TRACKPOINT 3 SYSTEM COMPONENTS FIGURE 1 3 ...
Page 21: ...TRACKPOINT 3 GENERAL INFORMATION 1 6 FIGURE 1 4 ...
Page 27: ...TRACKPOINT 3 GENERAL INFORMATION 1 12 ...
Page 28: ...SECTION TWO INSTALLATION ...
Page 29: ......
Page 34: ...TRACKPOINT 3 INSTALLATION 2 5 FIGURE 2 2 ...
Page 35: ...TRACKPOINT 3 INSTALLATION 2 6 FIGURE 2 3 ...
Page 38: ...TRACKPOINT 3 INSTALLATION 2 9 MODEL 4740A INSTALLATION FIGURE 2 5 ...
Page 39: ...TRACKPOINT 3 INSTALLATION 2 10 FIGURE 2 6 C A U T I O N ...
Page 52: ...TRACKPOINT 3 INSTALLATION 2 23 FIGURE 2 15 ...
Page 53: ...TRACKPOINT 3 INSTALLATION 2 24 FIGURE 2 16 ...
Page 56: ...TRACKPOINT 3 INSTALLATION 2 27 FIGURE 2 17 ...
Page 62: ...SECTION THREE OPERATION ...
Page 63: ......
Page 132: ...TRACKPOINT 3 OPERATION 3 69 ...
Page 177: ...SECTION FOUR PRINCIPLES OF OPERATION ...
Page 178: ......
Page 183: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 5 ...
Page 185: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 7 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3A ...
Page 186: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 8 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3B ...
Page 189: ...SECTION FIVE MAINTENANCE ...
Page 190: ......
Page 193: ...TRACKPOINT 3 MAINTENANCE 5 1 DSP CARD PROGRAMMING MODE JUMPER FIGURE 5 1 ...
Page 201: ...APPENDIX A CARE OF CABLES ...
Page 202: ......
Page 204: ...TRACKPOINT 3 APPENDIX A A 2 ...
Page 205: ...APPENDIX B STATIC DISCHARGE ...
Page 206: ......
Page 208: ...TRACKPOINT 3 APPENDIX B B 2 ...
Page 209: ...APPENDIX C WARRANTY ...
Page 210: ......
Page 212: ...TRACKPOINT 3 APPENDIX C C 2 ...
Page 213: ...APPENDIX D DRAWINGS ...
Page 214: ......
Page 216: ...TRACKPOINT 3 APPENDIX D D 2 ...
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 235: ......
Page 236: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 244: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......