ZyWAN User Manual
Configuring the ZyWAN
© 2008 Arcom Issue D
56
Button
Explanation
Iota Enabled
In Progress: 1
Repeat Test OK: 0
Repeat Test Failed: 0
Retry Command: 1
Current State: 1
Network Up
Server Connected
Retry: 1
Global State: 400
Number Get: 1
Number Post: 0
HTTP Status: 0
Proxy Not Trusted
OK
This response will be returned from the E725 before the
provisioning process is complete. This will be indicated by the “In
Progress: 1” message (above). Wait a short period of time, then
click
Get NAM Profiles
again – the provisioning attempt is
completed when the response contains “In Progress: 0”.
If this success message is not displayed here, another attempt
may be made to provision the account. If necessary, the entire
response text from the text area can be copied and pasted, in
order to request troubleshooting assistance from the service
provider.
Clear Status Area
Clicking the
Clear Status Area
button clears any previous status
information in the text area.
Summary of Contents for ZyWAN
Page 1: ...ZyWAN User Manual ...