![Arcom ZyWAN User Manual Download Page 55](http://html.mh-extra.com/html/arcom/zywan/zywan_user-manual_2964783055.webp)
ZyWAN User Manual
Configuring the ZyWAN
© 2008 Arcom Issue D
55
Button
Explanation
The normal response from this action should look something like
the following, and end with the sentence,
IOTA session completed
successfully!
Scroll to the bottom of the received text response to
validate that this message is given. The message looks like this:
<mmc mmcID=”126”
status-uri=””>
<method
id=”1”
name=”disconnect”
reportstatus=”false”
</mmc>
140> MMC session disconnected, session id=”126”
140> Resetting IOTA session, end status=0
140> HTTP: Shutdown
140> SSL session fff7f4 closed with status 0
140> SSL session fff7f4 deleted
141> Socket 275 closed
142> PPP closed
142> Netlib closed (app_id=101)
142> MIP Profile 1 was provisioned – Set active MIP profile
to 1
142> IOTA session completed successfully! Client initiated=1
OK
If this success message is not displayed here, another attempt
may be made to provision the account. If necessary, the entire
response text from the text area can be copied and pasted, in
order to request troubleshooting assistance from the service
provider.
(E725
response)
Status information is displayed below in the large area. The
following message is displayed:
Waiting for reply (this may take a few minutes to complete)…
The normal response from this action should look something like
the following:
HTTP Reply Status - 200
---> at
NO CARRIER
---> at
OK
---> at+iota=2
OK
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!! Please wait for IOTA session to complete the work. !!!
!!! Use 'Get NAM Profiles' option to verify IOTA status. !!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
------- IOTA STATUS -------
---> at+iota?
Summary of Contents for ZyWAN
Page 1: ...ZyWAN User Manual ...