45
SELETRON CONNECTION
Connect the new Seletron devices:
, IN A SEQUENCE FROM LEFT TO RIGHT (when looking at the boom from behind).
AFTER CONNECTING THE SELETRON, WAIT FOR APPROX. 4 SECONDS, THE MONITOR MAKES
AN ACOUSTIC SIGNAL AND DISPLAYS THE GREEN SYMBOL OF THE CONNECTED SELETRON.
ONLY NOW
is it possible to proceed with the installation of the following Seletron.
Tighten each Seletron onto the relevant nozzle holder, using a torque wrench and a tightening torque of 4.5 Nm / 40 Inch/lbs.
Alternatively, if you do not have a torque wrench, tighten the Seletron devices by hand and make sure there are no leaks.
ARAG IS NOT LIABLE FOR ANY DAMAGE OR MALFUNCTION CAUSED BY THE USE OF TOOLS DIFFERENT FROM THE
ONES INDICATED.
10
14
24
19
SELETRON CONNECTION SEQUENCE: 10, 14, 19 AND 24.
Fig. 94
~4
seconds