Intended use 

The pneumatic seeders of types PS 120 to PS 500 serve to spread seed with differ-
ent properties and grain sizes on open fields. 
The implements are designed solely for normal use in agricultural operations. Only 
cereal varieties that are intended by the manufacturer and listed in the operating man-
ual may be used. Different seeding shafts are designed for the different cereal varie-
ties, which must be used and replaced if necessary. A special version of the seed drill 
protected against corrosion can also be used for spreading fertiliser with a seeding 
shaft designed for this purpose (intended use). 
Any other use is considered to be non-intended. The manufacturer is not liable for 
any resulting damage, the operator alone bears the associated risk.   
Intended use also includes compliance with the conditions for operation, mainte-
nance, and repairs prescribed by the manufacturer.   
The applicable accident prevention regulations as well as the other general safety-re-
lated and occupational health regulations must also be observed.   
The manufacturer is not liable for any damage resulting from unauthorised modifica-
tions and the use of components and auxiliary parts. 

 

3.4 

Personnel requirements 

The implement may only be used, maintained and repaired by persons who have rel-
evant experience and were instructed on the risks. The safety instructions must also 
be handed over to other users. 

Qualification 

Persons who will be handling the seed drill must fulfil the following requirements: 

Personnel 

Activities 

Required qualification 

Forwarder 

 

Transport of the seed drill 
from one business to an-
other 

 

Experience with transport 
of machinery 

 

Qualification of a transport 
specialist for machinery

 

Transporter 

 

Transport of the implement 
within the farm 

 

Forklift driver 

 

Experience with handling 
the suitable lifting gear

 

Installer 

 

Installation and commis-
sioning of the seed drill 

 

Trained mechanic 

Setter 

 

Setting up the seed drill 

 

Experience in the agricul-
tural field 

 

Experience with handling 
the seed drill

 

Summary of Contents for HG 300 M1

Page 1: ...Version 4 1 EN Item no 00601 3 633 ORIGINAL OPERATING MANUAL Operating instructions PS 120 M1 PS 500 M2 Please read carefully before initial operation...

Page 2: ...measures 17 4 Transport installation and commissioning 19 4 1 Attaching the seed drill to a soil tillage implement 19 4 2 Attaching the seed drill to a tractor 20 4 3 Installing the dispersion plates...

Page 3: ...airs and service 43 8 Decommissioning storage and disposal 43 8 1 Decommissioning the seed drill 43 8 2 Storage of the seed drill 43 8 3 Disposal 43 9 Accessories 44 9 1 HG 300 M1 44 9 2 Fill level se...

Page 4: ...l Maintenance and repair personnel Parts of the document that must absolutely be read To prevent injuries and damage to the implement it is absolutely necessary to have read and understood the Basic s...

Page 5: ...ing plate is located on the steel frame on the left side near the handle over the motor cover Figure with the rating plate The image shows the layout of the rating plate The data on the rating plate h...

Page 6: ...300 M1 MG PS 500 M2 PS 500 M2 D PS 500 M2 MG HG 300 M1 Observed guidelines The implements and the optional devices fulfil the requirements of the following Euro pean Directives 2006 42 EC Machinery Di...

Page 7: ...grassland and cropland Seed drill layout No Designation Function 1 Seed tank cover Covering the seed tank Protecting the seed from moisture and foreign objects 2 Seed tank Carrying the seed Conveying...

Page 8: ...he following process takes place Phase Description 1 The operator sets the implement up for operation and fills the seed tank with seed 2 The operator activates the seed drill using the controls Resul...

Page 9: ...pressure in the tank line of the hydraulic motor As soon as one of the sensors reports an error the message Fan error appears on the control box Functioning of the temperature measuring strip The segm...

Page 10: ...hanical data Implement version Size Value PS 120 M1 D MG Max tank content 120 l Weight 45 kg Dimensions H W D in cm 90 x 60 x 80 PS 200 M1 D MG Max tank content 200 l Weight 60 kg Dimensions H W D in...

Page 11: ...ing categories CAT I III only with three point linkage This section contains all requirements and measures that ensure safe operation of the seed drill 3 1 Safety instructions in this document What ar...

Page 12: ...Never use the seed drill for other purposes that may seem similar Observe all of the safety measures that are indicated in this operating manual and on the seed drill Do not make any modifications to...

Page 13: ...le accident prevention regulations as well as the other general safety re lated and occupational health regulations must also be observed The manufacturer is not liable for any damage resulting from u...

Page 14: ...The personnel must be equipped with the following personal protective equipment and wear it if necessary Hearing protection Mask Safety shoes with non slip soles 3 6 Safety devices Meaning of the saf...

Page 15: ...o thrown parts Maintain a safe distance from the im plement during operation Risk of injury due to moving parts Only work with mounted covers Risk of injury due to rotating parts Only operate the impl...

Page 16: ...ds Use hearing protection Hot surface Do not touch Maintain a safe distance from hot sur faces Risk of injury due to rotating parts Maintain a safe distance from rotating parts Risk of injury due to r...

Page 17: ...ue to the weight of the imple ment When lifting and lowering the implement The implement may only be transported with a forklift or lift truck by personnel trained for this task Risk of slipping stum...

Page 18: ...of injury due to seed being thrown out While spreading seed Always ensure that there is no body standing in the spreading range of the implement Risk of slipping stum bling and falling When handling...

Page 19: ...on on the field the seed drill can be attached to a soil tillage implement such as a cultivator or a harrow The attachment must be installed individually Requirements The following requirement must be...

Page 20: ...ground 2 Use the lifting gear to place the seeder 2 on the counter plate 1 3 Fasten the seeder 2 with bolts and nuts on the counter plate 3 4 2 Attaching the seed drill to a tractor Purpose For operat...

Page 21: ...k mounting kit 2 Seed drill Procedure To attach the seed drill to a tractor using the top link mounting kit Step Description 1 Fasten the top link mounting kit 1 with bolts and nuts onto the seed dril...

Page 22: ...ates on the soil tillage implement Step Description Explanation illustration 1 Using the pliers bend the tabs on the sides of the dispersion plates down by 80 Result 2 Distribute the dispersion plates...

Page 23: ...st be fulfilled for this work step None Required components tools and materials For this work step the following components tools and materials are required Hose roll Cutting tool Hexagon key WAF17 or...

Page 24: ...ent and dispersion plates Step Description Illustration 1 Insert the ends of the hose through the openings in the large tab 3 of the dis persion plate and slide the fastening clip 4 onto the hose 2 Pu...

Page 25: ...page 40 Required components tools and materials For this work step the following components tools and materials are required Hexagon key Torx screwdriver TX 30 Procedure This is how you remove the swe...

Page 26: ...Coupling sleeve alternative 4 Coupling connector 5 Return line 6 Pressure line Procedure This is how to connect the hydraulic fan Step Description 1 Completely close the flow control valve 2 on the h...

Page 27: ...h and speed For this reason it is not possible to give precise specifications for the correct fan settings it must be determined in field trials Reference values for the fan setting can be found in th...

Page 28: ...l valve on the tractor set the oil quantity to zero 3 Start up the fan and run up to the desired fan speed slowly increase the oil quantity Setting table for the flow control valve valid for approx 50...

Page 29: ...more information 2 If necessary take measures to adjust the spread rate Suitable measures are Selection of the seeding shaft see Selecting the right seeding shaft On page 31 for more information Selec...

Page 30: ...components tools and materials For this work step the following components tools and materials are required Calibration bag Hexagon key Procedure This is how to perform a calibration test Step Descrip...

Page 31: ...improved Requirements The following requirement must be fulfilled for this work step None Required components tools and materials For this work step the following components tools and materials are r...

Page 32: ...the control box are ideally between 20 and 80 This ensures good regulation and homogeneous delivery of the seed even with ground speed related spreading at very low or high speeds 5 5 Changing the see...

Page 33: ...mponents tools and materials are required Hexagon key Overview Access to the agitator drive and the required tool No Designation 1 Bearing cover 2 Hexagon key holder 3 Cover nuts 4 Drive belt 5 Bearin...

Page 34: ...ft with the free journal forwards into the steel frame 9 Turn the seeding shaft until the fitted key of the gearbox motor engages in the groove of the seeding shaft 10 Fit the bearing flange with its...

Page 35: ...k On page 41 for more infor mation Required components tools and materials For this work step the following components tools and materials are required None Procedure This is how to check the ease of...

Page 36: ...e appropri ate notch of the setting scale The following orientation rules apply here For fine seed increase the brush pressure up to 5 For coarse seed reduce the brush pressure up to 4 5 8 Filling the...

Page 37: ...eed tank 2 3 To close the seed tank turn the cover 1 clockwise 5 9 Deactivating the agitator Purpose Use of the agitator is only required for seed types that tend towards bridging or for very light se...

Page 38: ...rials are required Hexagon key Drive belt Overview No Designation 1 Bearing cover 2 Hexagon key holder 3 Cover nuts 4 Agitator 5 Seeding shaft Procedure This is how to deactivate the agitator Step Des...

Page 39: ...Remedy The seeding shaft does not ro tate when the drive shaft of the gearbox motor is rotating The fitted key fell out of the drive shaft Stick on a new fit ted key The seed hoses get clogged Fan spe...

Page 40: ...t the seed drill is disconnected from the power supply Requirements The following requirements must be fulfilled for this work step None Required components tools and materials For this work step the...

Page 41: ...Disconnecting the seed drill from the power source On page 40 Required components tools and materials For this work step the following components tools and materials are required None Procedure This...

Page 42: ...om the power source On page 40 Required components tools and materials For this work step the following components tools and materials are required Air compressor Moist cloth Procedure To clean the se...

Page 43: ...remains fully functional even if it is out of operation for longer periods of time it is important to take precautions for storage Procedure This is how to prepare the seed drill for storage Step Desc...

Page 44: ...Scope of delivery 1 HG 300 M1 1 Support 1 Flow regulator incl hydraulic hoses Order number Item no 08001 2 044 9 2 Fill level sensor This sensor can be retrofitted on the PS 120 200 300 M1 Operation...

Page 45: ...n can be ordered as an accessory Scope of delivery 1 Cable extension Order number Item no 00410 2 148 9 4 Cable extension 5 m 6 pin If the standard installed 6 m implement cable is too short due to th...

Page 46: ...experience is gained in practice Our motto Inspired by Farmers realized by Professionals This is how customer proximity of the development department creates a leading edge for you and APV Tell us abo...

Page 47: ...47 10 2 Connection diagram...

Page 48: ...ton optional brown 0 75 10 Calibration button optional Black 0 75 11 Fan not with HF Blue 4 0 12 Fan not with HF brown 4 0 13 Fill level sensor optional brown 0 75 14 Fill level sensor optional Blue 0...

Page 49: ...49 10 3 Hydraulic diagram Pos Description A G bolted connection XGE 15 LR ED Max hose length 1 m Motor side connection B B G bolted connection XGE 15 LR ED Max hose length 1 m Motor side connection A...

Page 50: ...ection XGE 18 LR ED Max hose length 6 m Coupling connector BG3 Marked in red Max flow rate 80 l min Max pressure 220 bar T G bolted connection XGE 22 LR ED Max hose length 6 m Coupling connector or co...

Page 51: ...03 0 22 0 45 0 61 10 0 20 2 30 0 99 1 95 0 49 0 76 1 17 20 0 28 4 52 1 79 3 78 1 03 1 39 2 30 30 1 58 6 70 2 59 5 61 1 38 1 98 3 42 40 4 11 8 82 3 39 7 44 1 55 2 54 4 55 50 6 63 10 94 4 19 9 27 1 72...

Page 52: ...0 11 0 04 0 01 5 0 39 0 99 0 50 0 70 0 21 0 06 0 02 10 0 90 1 74 0 78 1 40 0 38 0 10 0 05 20 1 92 3 24 1 35 2 82 0 72 0 18 0 10 30 2 86 4 68 1 92 4 23 1 03 0 29 0 16 40 3 74 6 07 2 49 5 65 1 32 0 45...

Page 53: ...fff GGG GGG 2 0 01 0 15 0 18 0 54 0 24 0 66 0 46 5 0 02 0 46 0 48 0 87 0 62 1 18 0 99 10 0 04 0 98 0 97 1 41 1 27 2 05 1 87 20 0 07 2 02 1 96 2 51 2 55 3 79 3 62 30 0 12 3 03 2 95 3 61 3 60 5 33 40 0...

Page 54: ...b fb ffff fb f fb fb ffff GGG 2 0 76 3 37 0 04 0 33 0 10 0 30 0 42 5 1 42 3 89 0 15 0 75 0 21 0 70 1 11 10 2 51 4 75 0 33 1 74 0 40 1 38 2 26 20 4 71 6 48 0 68 2 86 0 79 2 73 4 56 30 8 00 1 00 4 23 1...

Page 55: ...b fb ef eb fb 2 0 04 0 56 0 14 0 34 0 46 0 95 0 03 5 0 15 1 37 0 31 0 77 0 67 1 45 0 05 10 0 33 2 72 0 61 1 49 1 02 2 29 0 08 20 0 70 5 41 1 19 2 94 1 72 3 96 0 15 30 1 06 6 99 1 52 2 42 5 63 0 26 40...

Page 56: ...5 0 03 0 00 0 12 1 27 5 0 66 1 57 0 12 0 05 0 08 0 19 2 25 10 1 00 2 49 0 24 0 08 0 21 0 30 3 67 20 1 68 4 32 0 47 0 15 0 46 0 54 6 73 30 2 36 6 15 0 25 0 72 0 77 9 54 40 3 04 7 98 0 38 0 98 1 00 11 9...

Page 57: ...3 82 1 43 3 15 3 05 0 41 0 46 1 45 20 6 90 2 45 5 35 6 25 0 71 0 78 2 51 30 10 08 3 46 7 55 9 16 1 02 1 10 3 56 40 13 11 4 48 9 75 12 02 1 32 1 41 4 61 50 16 15 5 49 11 95 14 67 1 63 1 73 5 66 60 18 8...

Page 58: ...rage and disposal 44 Description 7 Disconnecting the seed drill from the power supply 20 21 26 31 33 37 38 41 42 43 Disposal 44 E EC Declaration of Conformity 6 Emptying the seed tank 33 36 42 43 F Fa...

Page 59: ...ervice 6 36 40 44 Setting and adjusting the spread rate 30 Setting the brush pressure 30 31 36 Setting the hydraulic fan HF 28 Storage of the seed drill 44 T Technical data 11 20 21 Top link mounting...

Page 60: ...tzelsdorf Austria Telephone 43 0 2913 8001 Email office apv at Fax 43 0 2913 8002 Web www apv at Impressum APV Technische Produkte GmbH Gesch ftsf hrer Ing J rgen Sch ls Dallein 15 3753 H tzelsdorf st...