NOTES FOR USERS AND MAINTENANCE
4.
TECHNICIANS
i
Compliance with Machinery Directive 2006/42 CEE,
once you have installed the equipment, you must
compile a Declaration of Conformity and a Scheduled
Maintenance Plan in compliance with the Machinery
Directive and then hand over copies of these
documents to the user.
Correct use of the operator
4.1
The operator is designed for use on swing gates for
intensive and continuous residential shared use, with a
maximum number of
700
opening/closings per day (for
FORTY 5500-4M) /
600
opening/closings per day (for FORTY
5500-7M).
Carefully read the Warning and Safety standard provided.
E
4.2
mergency release system for manual operation
In the event of mains power supply failure or malfunction,
the operator must be released so the gate can be moved
manually (
fi
g.15
).
!
In any case, the manual release/relock operations, must
be carried with electrical power disconnected
.
#
ONLY
VERSION
4M
OPEN the sliding cover of the operator casing:
•
press lightly and slide it.
Lift the round cap of the lock to enter the unlocking key.
•
Turn 180 ° counterclockwise the supplied release key to
•
unlock.
When the gate has been opened or closed as required, the
•
operator must be locked again by turning the key through
180° in an clockwise direction.
!
Remove the release key after use and close the round
cap of the lock.
ONLY
VERSION
4M
Always close the sliding cover of the operator
casing at the end of each release/relock
operation.
Routine maintenance
4.3
You should ask the company that installs the automation to
provide a scheduled maintenance plan in compliance with
the regulations for this type of equipment.
The maintenance recommended by
Aprimatic S.p.A.
for the
lock parts is listed in the
tab.3
.
!
Before doing any maintenance job, turn the operator off
by means of the differential switch of the electric system.
OPERATION
INTERVAL
CHECK
THE
STRENGTH
AND
STABILITY
OF
THE
GATE
STRUCTURE
;
CHECK
THE
HINGES
ON
THE
GATE
AND
ENSURE
THEY
ARE
PROPERLY
LUBRICATED
.
EVERY
12
MONTHS
CHECK
THE
MECHANICAL
RESISTANCE
OF
HINGES
,
OPERA
-
TOR
COUPLINGS
AND
LIMIT
STOPS
;
LUBRICATE
THE
FRONT
AND
REAR
MOUNTING
PIVOTS
OF
EACH
OPERATOR
USING
GRAPHITIZED
GREASE
.
EVERY
6
MONTHS
CHECK
THE
OPERATION
OF
THE
SYSTEM
;
CHECK
THAT
THE
MANUAL
EMERGENCY
RELEASE
AND
THE
HYDRAULIC
LOCK
ARE
WORKING
PROPERLY
.
EVERY
6
MONTHS
CHECK
THE
SETTING
OF
THE
MAX
PRESSURE
VALVE
.
EVERY
6
MONTHS
CHECK
THE
OIL
CHARACTERISTICS
IN
THE
SYSTEM
-
WE
RECOMMEND
THE
OIL
REPLACEMENT
IN
ANY
EVENT
NO
LATER
THAN
12/18
MONTHS
.
!
Use exclusively AprimOil.
EVERY
6
MONTHS
ENSURE
THE
ELECTRICAL
SYSTEM
,
THE
EARTH
CONNEC
-
TIONS
AND
THE
DIFFERENTIAL
SWITCH
ARE
EFFICIENT
.
EVERY
6
MONTHS
CLEAN
THE
STRIKER
PLATE
OF
THE
ELECTRIC
LOCK
(
WHERE
INSTALLED
).
EVERY
6
MONTHS
Emergency release for manual operation
fi
g. 15 -
Recommended maintenance
tab. 3 -
180°
!
push and slide !
&