18
-
English
gate
160 mm
37÷45 mm
220 mm
90°
Fig.10
CLOSING
OPENING
!
Electrical cable
tube has to be placed
outside the foundation
plate
foundation plate
Opening
300 mm
A
220 mm
A mm
180 max
70 min
20 mm
Fig.8
397 mm
Fig.7A
Fig.7B
398 mm
45°
Fig.9
The plate must be perfectly level !
Remove any cement splashes.
!
Ø 35 mm cable
for passage tube
X
(50 mm)
X
(50 mm)
52÷60 mm
CLOSING
OPENING
closing
end limit
plate
opening
end limit
plate
gate
rack
X
= safety distance in compliance with the current standards
ADJUST
THE
END
LIMIT
PLATES
IN
SUCH
A
WAY
TO
ANTICIPATE
THE
MECHANICAL
STOP
POSITION
OF
THE
GATE
OF
THE
DISTANCE
X
.
Fig.11
DO
NOT
POSITION
THE
OPERATOR
IN
THE
TRANSIT
AREA
.
opening safety
mechanical stop
AT 80/E
SLIDING GATES
FITTING THE OPERATOR
4.
Realise the foundation for the plate to be cemented and use
the fi xed or pivoting support kit to install the operator.
Warning
!
Other assembly methods where the motor base is not
horizontal are forbidden by the manufacturer.
During the inspection in-situ the installer must ensure
there is space enough all around the gate panel suffi cient
for the overall dimensions considering the installation
type: fi xed or pivoted Fig.7 A-B.
Preparation for installation
4.1
The support base for the operator must be result a few
centimetres above the surrounding ground level.
In very snowy zones or areas subject to flooding we
recommend positioning the plate 10-12 cm above the
ground surface.
Warning
!
It is essential that the foundation works be carried out
perfectly, following the Fig.10-11 instructions, in order
to obtain the correc position of the operator and the
electrical cable with respect to the wing gate.
Excavate a trench (dimensions given in
•
Fig.8
) and fi ll it
with good-quality cement.
Position the plate with the bended clips into the cement
•
trench (
Fig.9
).
IMPORTANT! Check the horizontal position of the plate with
a level - Meet the Fig.10 quotas.