
Operator’s
Manual
Rev
A
4/30/12
pg.
9
Internal
Components
–
Rear
View
Peristaltic
Pump
Supply
Manifold
Pressure
Sensors
Waste
Valves
(1
– 6)
Main
Electrical
Cabinet
Clamp
Bar
Cylinder
(1
of
8)
In
‐
Line
Heater
“t”
Manifold
Water,
Buffer,
78%
EtOH,
95%
EtOH
Supply
Valves
IDF
Inlet
Valve
Stations
4,
5
&
6
SDF
Inlet
Valve
Stations
4,
5
&
6
IDF
Inlet
Valve
Stations
1,
2
&
3
SDF
Inlet
Valve
Stations
1,
2
&
3
Enzyme
Supply
Valves
HCl
Supply
Valve
Summary of Contents for TDF
Page 2: ...This page intentionally left blank ...
Page 4: ...This page intentionally left blank ...
Page 16: ...Operator s Manual pg 16 Rev A 4 30 12 This page intentionally left blank ...
Page 30: ...Operator s Manual pg 30 Rev A 4 30 12 This page intentionally left blank ...
Page 46: ...Operator s Manual pg 46 Rev A 4 30 12 This page intentionally left blank ...
Page 56: ...Operator s Manual pg 56 Rev A 4 30 12 This page intentionally left blank ...
Page 70: ...Operator s Manual pg 70 Rev A 4 30 12 This page intentionally left blank ...
Page 72: ...Operator s Manual pg 72 Rev A 4 30 12 This page intentionally left blank ...