
Operator’s
Manual
Rev
A
4/30/12
pg.
25
11.11
If you plan to check the pH during the AMG step in the IDF process, press the Yes button. Otherwise, press the
No button. The following screen will be displayed.
11.12
The instrument is now completely set up and ready to automatically run the IDF/SDF procedure. Press the
START button to begin. At the beginning of each new run, the instrument automatically runs a test to check for
leaks in the tubing.
For the first run after a power-up cycle, or for the first run after the instrument has sat idle for twelve hours, the
following status screen will be displayed.
If the fluid lines are already charged properly, or when the line charge is complete, the following status screen will
be displayed.
Status
Overall
Progress
Action
in
progress
IDF
Time
remaining:
Lines
Charging
Please
wait…………..
XX:XX:XX
SDF
Time
remaining:
XX:XX:XX
pH
required?
Display
Temperatures
Yes
AOAC
991.43
IDF/SDF
Press
START
to
begin
AOAC
991.43
IDF/SDF
←
START
Check
pH
manually?
AOAC
991.43
IDF/SDF
←
Yes
No
Summary of Contents for TDF
Page 2: ...This page intentionally left blank ...
Page 4: ...This page intentionally left blank ...
Page 16: ...Operator s Manual pg 16 Rev A 4 30 12 This page intentionally left blank ...
Page 30: ...Operator s Manual pg 30 Rev A 4 30 12 This page intentionally left blank ...
Page 46: ...Operator s Manual pg 46 Rev A 4 30 12 This page intentionally left blank ...
Page 56: ...Operator s Manual pg 56 Rev A 4 30 12 This page intentionally left blank ...
Page 70: ...Operator s Manual pg 70 Rev A 4 30 12 This page intentionally left blank ...
Page 72: ...Operator s Manual pg 72 Rev A 4 30 12 This page intentionally left blank ...