February 2019
Section 4 Installation
Page 4
-
2b
Amerex Restaurant Fire Suppression System
(EX 4658)
Installing the Electric Control Head (P/N 26127)
The Electric Control Head is used in conjunction with the STRIKE™ ECS and is for UL
Certification only and cannot be considered for or used in installations of KP/ZD systems in
Canada.
Installation:
1.
Remove Shipping Cap (P/N 12862) & Cap Asy (P/N 15143) from top of Agent Cylinder Valve.
These parts will not be used (See Figure 1).
2.
Verify that the tapered end of the stainless steel piston is loosely captive at bottom of Electric
Control Head.
3.
Slide Retainer Nut (P/N 13595) over Electric Control Head & secure on top of Agent Cylinder
Valve as shown and tighten fully.
4.
Install Linear Actuator (P/N 24448) and tighten hand tight. Do not over tighten.
Do not use PTFE
thread tape. Ensure Linear Actuator body makes full contact with control head. The Linear
Actuator will be connected to the STRIKE ECS Panel (See STRIKE ECS Installation,
Operation and Maintenance Manual P/N
26692
, or Appendix C).
5.
A 1/2” junction box must be attached to the Electric Control Head (1/2” NPT) to house the
Actuation Lead Cable connection and Linear Actuator, with conduit protecting the Actuation Lead
Cable back to the STRIKE™ Unit. OEM or end cabinet installations housing both the KP
cylinders and STRIKE™ ECS do not require conduit.
LINEAR
ACTUATOR
(P/N 24448)
ACTUATION LEAD CABLE
(TO STRIKE UNIT
)
(1/2 NPT)
ELECTRIC CONTROL
HEAD (P/N 26127)
12862 (NOT USED)
15143 (NOT USED)
13595 (RETAIN)
Figure 1
(CONTROL HEAD)
(LINEAR ACTUATOR)
LINEAR ACTUATOR
MUST BE FULLY
SEATED TO STAINLESS
STEEL HEAD SURFACE
ELECTRIC CONTROL
HEAD (P/N 26127)
LINEAR ACTUATOR
(P/N 24448)
KP275, KP 375 &
KP475 ONLY
(
1/2” NPT
)
NUT RETAINER
(P/N 13595)