Structure and function
34
GreenDrill BAH0108-0 03.20
4.1.4
Calibration test
For calibration and when emptying the seed
hopper, the seed drops into the collection bucket
via the chute (1).
Always perform a calibration test
during the initial operation
when changing the sort.
if the same sort is used, but of a different quality and specific weight.
after changing the seed metering wheels
if the seed hopper is emptied faster/slower than expected. The actual spread rate then does not
correspond with the spread rate determined by calibration.
when changing the working speed
(not required when terminal 5.2 is connected to the 7-pin signal socket of the tractor or to the
radar or GPS device).
Summary of Contents for GreenDrill GD200-E
Page 2: ......
Page 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Page 105: ......