Implement settings before initial operation
GreenDrill BAH0108-0 03.20
41
WARNING
When using the machine, observe the safety instructions
in this operating manual
in the operating manual of the carrying implement.
CAUTION
Never open the seed hopper cover or metering unit cover with
the fan running. Seed escapes uncontrollably.
The seed hopper and metering units form a sealed pressurised
system.
Leaks in the sealed system can change the spread rate.
5.1
Folding and unfolding the ladder of the GreenDrill
To fill and adjust the GreenDrill, use the loading board that is equipped as a standard on the carrying
implement.
If the GreenDrill cannot be reached using the loading board of the carrying implement, the GreenDrill
is equipped with its own loading board with a ladder. This section provides general instructions that
should be observed when folding the ladder.
5.1.1 Unfolding the ladder
The ladder should only be unfolded when filling the hopper and
adjusting the GreenDrill.
To prevent collisions, the ladder should always be folded up when it
is not in use, e.g. during operation and before road transport.
1. Move the carrying implement into working
position.
2. Apply the tractor parking brake, switch the
tractor engine off and remove the ignition
key.
3. Unlock the ladder (1) and unfold.
Summary of Contents for GreenDrill GD200-E
Page 2: ......
Page 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Page 105: ......