![background image](http://html1.mh-extra.com/html/amano/em-e-ii/em-e-ii_operation-manual_2918185012.webp)
11
3
.
Preparation
(continue)
Be sure to read and understand on the page 3 to 7 “For safety operation” carefully before use
Installation
(continue)
Important
Be sure to observe the following to prevent malfunctions:
- There should be an open area above the exhaust ports, and sufficient space should have been secured
around the collector.
50 cm or longer
80 cm or longer
30 cm
or longer